Similar Projects
Sewer Pump Station #1 Replacement - Town of Beaufort
Demolition, New Construction, Infrastructure
Conception
$850,000 CJ est. value
Beaufort, NC 28516

Ridge Care Senior Living
New Construction, Infrastructure - 85,000 SF
Design
$22,700,000 CJ est. value
Morehead City, NC 28557

Kimeplex Business Park
New Construction - 50,000 SF
Design
$2,000,000 est. value
Morehead City, NC 28557

Morehead City Inner Ocean Bar Maintenance Dredging
Infrastructure
Bidding
$25,000,000 CJ est. value
Morehead City, NC 28557

RFQ D/B - Front Street Town Docks Fuel Storage Design and Build
Infrastructure
Bidding
$589,893 CJ est. value
Beaufort, NC 28516

East Double Tree Beach Access
Infrastructure
Post-Bid
Atlantic Beach, NC

Pine Knoll Shores Aquarium - Boardwalk / Deck Renovations
Infrastructure
Post-Bid
$625,000 CJ est. value
Pine Knoll Shores, NC 28512

Labor for Draw Bridge Operation Over the Straits- Harkers Island and the Trent River-new Bern
Infrastructure
Results
$307,120 CJ est. value
South River, NC 28516

Carteret County Schools - Addition to Carteret Preschool Center
Addition, Infrastructure - 3,041 SF
Results
$863,000 CJ est. value
Newport, NC 28570

Amwins
Renovation - 3,600 SF
Construction
$600,000 est. value
Morehead City, NC 28557

Compass Hotel / Beaufort
New Construction, Infrastructure
Pending Verification
$27,000,000 CJ est. value
Beaufort, NC 28516

Liberty Commons of Carteret County
New Construction, Infrastructure
Pending Verification
$23,145,199 CJ est. value
Newport, NC 28570

Dog park at McLean-Spell Park - City of Emerald Isle
Infrastructure
Design
$52,000 CJ est. value
Emerald Isle, NC 28594

Berth 4 and 5 Improvements
Infrastructure
Post-Bid
$400,000 CJ est. value
Morehead City, NC 28557

Hangar 75 Site Work
Infrastructure
Results
$344,685 CJ est. value
Beaufort, NC 28516

Last Updated 06/26/2023 10:03 AM
Project Title

AA Storage/ Beaufort

Physical Address View project details and contacts
City, State (County) Beaufort, NC 28516   (Carteret County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Office, Site Development, Warehouse/Storage
Contracting Method Bids by Invitation
Project Status Construction Commenced, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $16,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a Mini Storage facility totaling 150,567 square feet and includes: 4 – one-story climate controlled buildings, each totaling 24,000 square feet. 1 – one-story covered open air storage area totaling 52,967 square feet. 1 – two-story office totaling 1,600 square feet. As of June 23, 2023, this project has already commenced construction. *This project has been updated for historical data and reference purposes. The information has been provided as it was received and confirmed.

Details

,, 150,567 SF - 1 Story Above Grade, 96,000 SF. 1 Story Above Grade, 52,967 SF. 2 Stories Above Grade, 1,600 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents