Similar Projects
Last Updated | 05/16/2023 02:19 PM |
Project Title | Line of Sight Reconstruction Parking Ramps 38 and 63 |
Physical Address | View project details and contacts |
City, State (County) | Madison, WI 53715 (Dane County) |
Category(s) | Single Trades |
Sub-Category(s) | Concrete |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding, Construction start expected June 2023 |
Bids Due | View project details and contacts |
Estimated Value | $75,000 [brand] Estimate |
Plans Available from | Structural Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | All potential bidders must become certified by DOA prior to submitting bids on state construction projects with budgets over $50,000. All bids received from contractors who are not certified will be rejected. These changes take effect January 1, 2014. Contractor certification applications and instructions for completing the form may be obtained electronically. In general, the work consists of: Demolish (reduce in length) and reconstruct three wing walls and one column at two locations located at entry and exit lanes of: 1. Microbial Parking Garage Lot 38 (545 Babcock Drive) (bldg. #285-0A-9537) 2. American Family Childrens Hospital (AFCH) Lot 63 Parking Ramp (1655 Highland Avenue). (bldg. #285-0A-1425) The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsins prevailing wage laws. Effective September 23, 2017, state prevailing wage requirements on state building projects no longer apply. These changes take effect for projects advertised for bid after September 23, 2017. This change does not affect the Federal Davis Bacon Act requirements. This project involves the removal (reduce in length) and reconstruct three wing walls and one column at two locations located at exit lanes of Lot 38 and Lot 63. Demolition will consist primarily of concrete demolition, re-construction will consist of primarily concrete construction, with some minor masonry facade work, and some minor grading will be required at one wing wall. At Lot 63, fabrication and installation of a metal Pedestrian railing will be required. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |