Similar Projects
Phase 1 - Tower Terrace Road W/O Barnsley to Alburnett Road Grading and Drainage
Conception
$4,400,000 est. value
Cedar Rapids, IA 52407

USACE UPRR Culverts CC
Conception
$5,000,000 est. value
Cedar Rapids, IA

Cedar Rapids Flood Risk Management, Reach 3, 12th Avenue SE Road Closure & CRANDIC Railroad Closure
Term Contract
Design
$5,000,000 to $10,000,000 est. value
Cedar Rapids, IA

Cedar Rapids Flood Risk Management Project
Term Contract
Design
$10,000,000 est. value
Cedar Rapids, IA

Bioretention Cells at DCSD and Davis Street Properties
Infrastructure
Bidding
$300,000 est. value
Bloomfield, IA

Pioneer Avenue SouthEast at Oakridge Drive Drainage Improvements
Infrastructure
Bidding
$110,000 est. value
Cedar Rapids, IA 52403

Wanatee Tributary Restoration
Infrastructure
Post-Bid
$147,000 est. value
Marion, IA

Camp Dodge S-05 Parking Lot and S-38 Drainage Improvements
Infrastructure
Post-Bid
Johnston, IA

Jesup Drainage Ditch
Results
$153,885 est. value
Jesup, IA

Cedar Lane Culvert Replacements
Results
$431,000 est. value
Waverly, IA

USACE McLoud Run LWR CC
Conception
$2,500,000 est. value
Cedar Rapids, IA

S-04 Drainage Improvements
Infrastructure
Bidding
$200,000 est. value
Johnston, IA 50131

Drainage District No 82 Open Ditch and Lateral B Cleanout
Infrastructure
Post-Bid
Algona, IA

McLoud Run East Floodwall Construction
Infrastructure
Results
$1,504,558 est. value
Cedar Rapids, IA 52402

Phase 3 - Tower Terrace Road from C Avenue to W/O Barnsley Lane Grading and Drainage
Conception
$2,100,000 est. value
Cedar Rapids, IA 52407

Reported 04/28/2022 12:00 AM
Project Title

2022 Flood Repairs - Farmers Drainage District Woodbury County

Physical Address View project details and contacts
City, State (County) Hornick, IA   (Woodbury County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs), Construction Start Expected May 2022
Bids Due View project details and contacts
Estimated Value $315,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Work will include embankment in place, Class 10 channel excavation and leveling, 24" flap gate, Class B revetment, 24" CMP ENT culvert, mulching, seeding and fertilizing, and other related construction work including cleanup. A significant portion of the project will include repairing bank erosion caused during the 2019 flood event.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents