Similar Projects
Install Security Lighting for Motor Pool (Building 2685)
Term Contract
Design
$100,000 to $250,000 est. value
El Paso, TX 79906

Hanger Fans
Term Contract
Bidding

Energy Services
Post-Bid
El Paso, TX 79925

Generator Inspection and Repair, El Paso District
Post-Bid
El Paso, TX 79904

Site Electrical and Water Distribution Replacement
Results
Less than $425,300 est. value
El Paso, TX 79905

District Wide Lighting Upgrades
Results
El Paso, TX 79932

Electronic Filing System
Post-Bid
North Chicago, IL - Baltimore, MD - Lansing, MI - Columbus, OH - El Paso, TX 60064

Airways Aesthetics Maintenance
Results
El Paso, TX

5D4m-Replace Hospital Power Lines
Post-Bid
$25,000 to $100,000 est. value

Viscount Boulevard Roadway Lighting And Median Landscaping Project
Results
El Paso, TX

Transformer Testing and Maintenance on Switching Blades
Post-Bid
Falcon Heights, TX

Installation of New Lightning Protection System for Existing Security Fence and Connection to Existing ATCT Electrode Earth System (EES)
Results
$100,000 to $250,000 est. value
El Paso, TX

Facility A/C Bacnet Repair
Post-Bid

6515--756-20-2-960-0201 OR LED Exam Lights
Results
El Paso, TX 79930

N--Electronic Filing System, Lansing, MI
Post-Bid
Baltimore, MD - Lansing, MI - Columbus, OH - El Paso, TX

Last Updated 06/29/2021 08:06 AM
Project Title

Mesa LED Lighting System Replacement

Physical Address View project details and contacts
City, State (County) El Paso, TX 79925   (El Paso County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work: 1. Remove all existing LED lighting strips 2. Remove all wiring from LED drivers to LED strips 3. Remove two (2) control boxes from the top of the lower roof of the shelter 4. Install (2) two new control cabinets with proper ventilation openings at the same place as the existing ones. a. Cabinet needs to exceed all UL requirements. b. Ground connectors must be preinstalled. c. A barrier to segregate primary wiring from secondary wires. d. Suitable for dry, damp, and wet locations. 5. Install wiring duct and terminal strips to land the wires in the new control cabinet. 6. Install a square axial fan at each control cabinet. 7. Mount power supplies at each control panel. 8. Fabricate and install 1”x 3/16” aluminum flat-bars for the mounting of new LED lighting fixtures. 9. Retrofit all LED’s with brand new modules. Each module will create a beam able distribution to illuminate the surface isotopically without any hotspots, providing an even light translucence throughout the colored polycarbonate panels. And to have the ability to bends. No damage, cuts, modifications, or alterations shall be made to LED strips, and carry a (10) year-warranty on parts. 10. Label each control cabinet to the LED Lighting fixture side.

Details

Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents