Similar Projects
Boone Grove High School - New Wastewater Treatment Plant
New Construction
Bidding
$650,000 est. value
Valparaiso, IN 46385

Sonar Large Diameter Interceptor Inspections
Infrastructure
Bidding
$2,000,000 est. value
Fort Wayne, IN

CSO 1 Elimination
Post-Bid
Kokomo, IN 46901

Cane Run Flood Control Pumping Station 5
Post-Bid
$5,000,000 to $6,000,000 est. value
Jeffersonville, IN

Hessen Cassel Storm and Sidewalk Improvements
Results
Fort Wayne, IN 46800

I-65 Utility Extensions Division A
Results
DeMotte, IN

Sewer Main C.I.P.P. Rehabilitation Projects
Infrastructure
Bidding
$3,205,000 est. value
Marion, IN

Market Survey/Sources Sought for Construction Work at City of Portage Sewer Interceptor Rehabilitation, In Porter County, Portage, Indiana
Post-Bid
$1,000,000 to $5,000,000 est. value
Portage, IN

Cabin Sewer Improvements
Results
Nashville, IN 47448

Honeysuckle Sanitary Force Main Replacement
Infrastructure
Bidding
$400,000 est. value
Leo-Cedarville, IN 46788

Market Survey/Sources Sought for Construction Work at Gary Sanitary District - 27th and Chase Pump Station Force Main Replacement, In Lake County, Gary, Indiana
Post-Bid
Gary, IN

West Lafayette Campus -Bid Package #2: Controlled Environment Phenotyping Facility Growth Chamber 2 Utilities Installation - 2021
Results
West Lafayette, IN 47907

Airport Lift Station Rehabilitation
Post-Bid
Sellersburg, IN 47172

West Lafayette Campus - Bid package 7: Multiple Sanitary and Storm Sewer Repairs - 2021
Results
West Lafayette, IN

WCCD Industrial Park Lift Station
Post-Bid
Avon, IN

Last Updated 06/07/2022 10:11 AM
Project Title

Hospital and Industrial Park Lift Station Improvements

Physical Address View project details and contacts
City, State (County) Sullivan, IN   (Sullivan County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of constructing the following: Installation of a two new sanitary sewer lift station named the Hospital and Industrial Park Lift Stations. Both lift stations will have an 8-foot diameter wet well with duplex pumping capabilities. Both lift stations will contain a valve vault structure; combination air valve structures; for the Hospital Lift Station approximately 1,837 feet of 6-inch force main (open cut or horizontally directionally drilled) to existing gravity sewer line; for the Industrial Park Lift Station approximately 100 feet total of 8-inch force main (open cut) to connect to the existing 6-inch force main, and 2,745 feet total of 8” to 12” gravity sewer; approximately 3 sanitary sewer lateral reconnections; approximately 13 48” sanitary sewer manhole installations (one of which being a polymer manhole); associated sanitary testing; electrical coordination; electrical and instrumentation work; lift station demolition; and retirement of existing sanitary sewer facilities for both existing lift stations. Work shall also include all supervision, equipment, materials and labor, temporary erosion control, clearing and grubbing, traffic control, bypass pumping, all testing, granular backfill, flowable fill, pavement restoration final grading and seeding and all appurtenances necessary to complete the work shown in the drawings and specifications.

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents