Similar Projects
Last Updated | 11/07/2022 12:37 PM |
Project Title | Central Pump Station |
Physical Address | View project details and contacts |
City, State (County) | Houston, TX 77002 (Harris County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Lift and Pump Stations, Site Development, Storage/Water Tanks, Water Lines |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | Results, Construction start expected October 2022 |
Bids Due | View project details and contacts |
Estimated Value | $92,860,000 [brand] Estimate |
Plans Available from | County Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Project Number-14-0315 The deadline to ask questions is 9/15/2022 2:00 PM CST Scope of Contract is for construction of Central Pump Station (CPS) that will receive the Water from the upstream Re-Pump Station and then transfer the flow to the Municipal Utility District Storage Tanks throughout the system. The CPS will include site facilities (incl. transmission lines, yard piping, primary and auxiliary power systems, cathodic protection, and security systems) chemical facilities, ground storage tanks, a high service pump station (enclosed in the Pump building), an operations building, and maintenance building. Details of this work are provided in the Construction Drawings and Project Manual. This project is a part of the overall Surface Water Supply Project. Contractors have been pre-qualified to bid on this project. Only those Prequalified Prime firms listed below are eligible to submit a bid for the contract. 1. Provide the materials, equipment, and incidentals required to make the project completely operable. 2. Provide the labor, equipment, tools, and consumable supplies required for a complete project. 3. Provide the civil, architectural, structural, mechanical, electrical, instrumentation and all other work required for a complete and operable project. a. Comply with Owner provided tagging standard when tagging all electrical and instrumentation conduit, conductors, panels and associated electrical and instrumentation appurtenances. Contractor shall contact Owner to obtain latest version of tagging standard prior to creating tags. 4. Test and place the completed project in operation. 5. Provide the special tools, spare parts, lubricants, supplies, or other materials as indicated in Contract Documents for the operation and maintenance of the Project. 6. Install Owner provided products and place in operation. 7. Drawings and specifications do not indicate or describe all of the work required to complete the project. Additional details required for the correct installation of selected products are to be provided by the Contractor and coordinated with the Engineer. |
||||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |