Similar Projects
Rome Township Landslide Repairs Phase II
Post-Bid
Less than $1,004,890 est. value
Guysville, OH 45735

Precast Concrete Headwalls
Post-Bid

City of Nelsonville – Flood and Drainage Improvements
Results
$60,800 to $66,880 est. value
Nelsonville, OH 45764

Culvert Replacement - SR 691-06.42
Results
OH

Jacking and Boring Services
Post-Bid

ATH-CR10-7.25 Landslide Repairs
Results
Less than $149,000 est. value
Athens, OH 45701

ADS, Hancor, Haviland and Baughman Name Brand Plastic Tubing, Pipe and Fittings
Post-Bid

Box Culverts
Results

Concrete Pipes
Results

Precast Catch Basins, Risers, and Grates
Term Contract
Results

Slide Repair - SR 124-01.60
Results
OH

ATH-TR153-2.33 Landslide Repairs
Results
Less than $210,500 est. value
Athens, OH 45701

ATH-CR28-4.43 Landslide Repairs
Results
Less than $152,000 est. value
Athens, OH 45701

Miscellaneous - Culverts FY2020A
Results

Slide Repair - SR 56-10.08
Results
Athens, OH 45701

Last Updated 07/01/2020 10:27 AM
Project Title

Truetown Test Plant Relocation

Physical Address View project details and contacts
City, State (County) Athens, OH 45701   (Athens County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $49,508
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of a relocation of an existing Acid Mine Drainage (AMD) treatment facility located at Corning Village Park, 132 S. Valley St. Corning, Ohio 43730 to the aforementioned site along Truetown Rd. The current treatment facility consists of three (3) tanks of various sizes and materials along with various piping, components both electrical and water related in nature, and support structures that shall either be relocated or removed completely. Relocation of the test facility shall not commence until construction of an access road & apron and 50’ x 15’ concrete pad are completed for the facility to transplant to. The test facility shall be set up to test treatment of water supplied from a mine shaft of a known underground mine complex that is currently emanating mine drainage into an onsite channel. A flow monitoring flume shall also be constructed within this mine drainage channel. Prior to completion, the site will be regraded. Once the site isfinal graded it shall be fertilized, seeded and mulched. Additional work items shall include but not limited to clearing and grubbing of approx. 0.75 acres, installation of geogrid, dewatering, installation of vinyl sheet piling, construction of a chain link fence, installation of a water pump and waterline, various electrical installation and wiring, forming and pouring of concrete, culvert installation and requisition of off-site borrow material.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents