Similar Projects
Multi-Well Federal Plugging Contract Region VI
Infrastructure
Bidding
$75,000 est. value
Charleston, WV

Multi-Well Plugging Contract for Orphaned, Abandoned Wells Region 1
Infrastructure
Bidding
$400,000 est. value
Charleston, WV

Thrush Chilled Water Pump
Post-Bid
Kearneysville, WV 25430

New Complete 3 Phase Pump Unit
Infrastructure
Post-Bid
Spencer, WV

Water System Improvements - Water Pump Station Upgrades - Contract 2
Results
$347,000 est. value
New Creek, WV 26743

Water Well Sealing
Results
WV

Multi-Well Federal Plugging Contract Region V
Infrastructure
Bidding
Charleston, WV

Water Pump-Motor Skid Replacement B.11
Infrastructure
Results
Charleston, WV 25305

Multi-Well Federal Plugging Contract Region II
Infrastructure
Bidding
$400,000 est. value
Charleston, WV

Chaplin Hill Lift Station Pumps
Infrastructure
Results
Morgantown, WV

Multi-Well Federal Plugging Contract Region III
Infrastructure
Bidding
$200,000 est. value
Charleston, WV

Clay 1 Well Plugging
Infrastructure
Results
West Hamlin, WV 25571

Multi-Well Federal Plugging Contract Region IV
Infrastructure
Bidding
$400,000 est. value

6th Street Pump Station Pump and Control Panel Replacement
Infrastructure
Results
$54,150 est. value
South Charleston, WV

Ben's Run Well Plugging
Infrastructure
Results
Friendly, WV 26146

Reported 07/06/2022 12:00 AM
Project Title

SBR Control Restoration and Submersible Pumps

Physical Address View project details and contacts
City, State (County) Mullens, WV   (Wyoming County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $230,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1) SBR control system/ restoration necessitated by the age of the facility and changes in technology. The upgrade/restoration shall consist of but not limited to a new PLC and HMI, Graphic Operator Interface and process control programing that adjust the cycle timing as a function of influent flow. The installation shall have the capabilities to enhance the plants performance by monitoring the DO levels in the future, as a minimum. 2) Submersible Pumps shall be Flygt or acceptable equals and compatible to the existing pump bases and slide rail system.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents