Similar Projects
Replace/Repair Roofing Systems
Alteration
Design
$219,200 est. value

Roof Replacements at Alpine Hills Clubhouse, Sportscore One Soccer Center, Blackhawk Shelter and Lockwood Observatory
Alteration
Bidding
$290,000 est. value
Rockford, IL 61108

East Building Addition Phase II
Addition
Post-Bid
Lincolnshire, IL 60069

Roofing Repair and Maintenance
Post-Bid

Roof Restoration
Results
Rockton, IL 61072

Interior Renovations At Ellis Elementary School And RESA Middle School
Renovation
Results
Rockford, IL

General Window, Siding, and Gutter Repair
Term Contract
Post-Bid
Rockford, IL

HVAC Upgrades and Interior Finishes - West Middle School
Results
Rockford, IL 61103

HVAC and Mechanical Products
Term Contract
Post-Bid

Rockton Summer Work 2021 - Secure Vestibule
Results
Rockton, IL 61072

Dewatering Building Parapet Repairs and Reroofing
Post-Bid
Rockford, IL

Terminal Re-Roofing
Results
Rockford, IL 61109

General Roofing Repairs
Post-Bid
Rockford, IL

Replace Roofing System and Renovate Exterior
Results
Less than $2,000,000 est. value
Machesney Park, IL 61115

Miscellaneous Summer Projects 2021
Post-Bid
Winnebago, IL 61088

Last Updated 05/23/2022 03:24 PM
Project Title

Roof Replacement and HVAC System Upgrades

Physical Address View project details and contacts
City, State (County) Rockford, IL 61103   (Winnebago County)
Category(s) Education, Single Trades
Sub-Category(s) Elementary School, HVAC, Middle/Senior High School, Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Division 01 - General Requirements.
Division 02 - Existing Conditions, Demolition, Selective Demolition.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Miscellaneous Rough Carpentry, Sheathing, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Metal-Framed Skylights, Hardware, Glazing.
Division 09 - Finishes, Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Non-Structural Metal Framing, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Panel Ceilings, Resilient Flooring, Carpeting, Painting, Interior Painting.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Intrusion Detection, Intrusion Detection Systems Infrastructure, Fire Detection and Alarm, Digital, Addressable Fire-Alarm Systems.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents