Similar Projects
New Rosewood Middle School
New Construction
Conception
Goldsboro, NC

Alternative Programs School Renovation
Renovation
Conception
Greensboro, NC 27401

New K-8 Facility
New Construction, Renovation - 155,000 SF
Design
$55,000,000 est. value
NC

Felton Grove High School (H-12) - Wake County Public School System
New Construction - 360,000 SF
Design
$170,000,000 CJ est. value
Apex, NC 27539

RFP Construction Manager at Risk - New College of Education Project
Demolition, New Construction, Infrastructure - 110,000 SF
Bidding
$63,000,000 CJ est. value
East Fayetteville, NC 28301

RFQ Construction Manager at Risk - Construction Manager at Risk Selection (Multiple Projects)
Addition, Demolition, New Construction, Renovation, Infrastructure
Bidding
$460,000 CJ est. value
Raleigh, NC 27601

RFQ Contractor - Felton Grove High School Project
New Construction, Infrastructure - 360,200 SF
Sub-Bidding
$2,000,000 CJ est. value
Apex, NC 27539

Elon/Hawk/Polo Ridge Relief School - Roadwork Package
Infrastructure
Sub-Bidding
$300,000 CJ est. value
Charlotte, NC 28202

New Middle School
New Construction
Post-Bid
$61,000,000 est. value
Jefferson, NC

New Northern High School Replacement
New Construction - 278,613 SF
Post-Bid
$51,250,000 est. value
Durham, NC 27704

Henderson County Public Schools Rugby Middle School Office Renovation
Renovation
Results
Hendersonville, NC 28792

Rigging and Equipment Renovations for Auditoriums
Renovation
Results
Lake Waccamaw, NC 28450

Thales Academy at Chatham Park
New Construction - 54,284 SF
Construction
$4,092,533 est. value
Pittsboro, NC 27312

New Addition and Renovations of Southern Alamance High School
Renovation, Addition - 27,525 SF
Construction
Less than $20,661,931 est. value
Graham, NC 27253

New Middle School (M-19) and High School (HS-11) - Wake County Public Schools
New Construction, Infrastructure
Pending Verification
$128,149,254 CJ est. value
Morrisville, NC 27560

Last Updated 10/11/2022 07:35 AM
Project Title

2022 Shallotte Middle School Canopy

Physical Address View project details and contacts
City, State (County) Shallotte, NC 28470   (Brunswick County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $150,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

2022 Shallotte Middle School Canopy The contractors are responsible for all items required to complete the scope of services; those items being included in the scope of services even if not listed below. The subcontractors workmanship shall be equal to or exceed the workmanship of reputable contractors performing similar work in the Wilmington Metropolitan Service Area. Contractor shall perform the following scope of work in compliance with all federal, state, and local codes and in accordance with any plans, specifications and engineered drawings, design, or criteria. The general scope involves furnishing and installing of Aluminum Canopy Systems. Work to include but not limited to suppling of Engineered Drawings, include any cost for geotechnical soil borings or data if needed or required, include permit cost, include all material and labor for the layout of footings, dig, prep and place footings for canopy systems, and installation of canopy systems, and all incidental work relating to the project to provide the complete and fully functional operating canopy systems. Contractor is responsible for scope and to verify all dimensions and sizes. Location- Shallotte Middle School - 225 Village Road Shallotte, NC 28459 Canopies o Furnish and install a pre-engineered (free standing) extruded aluminum walkway canopies with internal rain gutter, matching existing profile, panels, and color. Posts, Beams/Gutters sized as needed per Engineered drawings, manufacturer requirements and in compliance with all Local, State, and Federal Building Codes. o Obtain the pre-engineered metal canopy from a single source who will manufacture the canopy. Provide fully engineered shop drawings giving wind load 150 MPH and live load criteria, sufficient for Permitting, and Owner review for complete construction of canopy. o Approved manufacturers: Superior Metal Products, Perfection Architectural Systems, Mitchell Metals, or approved equal, for the aluminum walkway canopies. o This project will consist of two free standing canopies. - One free standing canopy approximately 6'-0" wide and 35'-0" long between the 400 and 500 Pods over concrete walk between Pods. - One free standing canopy approximately 10'-0" wide and 118'-8" long extending from the 6'-0" Canopy between Pods 400 and 500 covering the sidewalk towards the bus lot. - One free standing 10' wide and 50'-0" long Canopy perpendicular at the end of the 118'- 8" Canopy at the bus lot o The total canopy deck of proposed new canopies between the 400 and 500 Pods leading to the Bus Lot should be approximately 1897 SF in total area. o Field conditions and manufacturer specifications will determine actual finish size Footings: Site investigation for existing utilities is mandatory before any excavation occurs. Call UTILITY LOCATE COMPANY for locating existing utilities. Contractor shall be responsible for any soil testing if necessary. Bore or make neat uniform footings, as required to support columns, and as specified by canopy manufacturer, engineered calculations and drawings and being in compliance with all federal, state, and local building codes. Concrete foundations shall extend to within 4" of grade at all locations. If columns must be installed into existing concrete walks, pads, or slabs, then walks, pads, and slabs shall be diamond cut and footings installed with the balance of the concrete to be placed level with existing walks, pads, and slabs to match finish as closely as possible. Contractor will install control joints where new concrete finish meets existing concrete finish of walks, pads, and slabs where columns are to be installed. o The color of panels, posts, and fascia are to be selected by Owner. o All joints and connections will be tight and clean, and all surfaces of work left in a clean condition. o Decking Panels: shall be Pan and Cap, extruded aluminum in a baked enamel finish, color chosen by the owner. o Fascia/Gutter: Install extruded aluminum fascia/gutter with matching finish. o Canopy Columns: Extruded aluminum canopy columns to be 6" x 6" columns installed and spaced no more than 10-foot intervals. o Canopy Beams: Extruded aluminum Beams sized as required The Contractor shall begin the work upon receipt of the Purchase Order, and expeditiously, with adequate forces, complete the work within the specified calendar days. The required milestone dates, and completion date are included in Exhibit 1. The contractor shall coordinate all work with Operations personnel to ensure minimal disruption to school activities. Should the Contractor fail to substantially complete the Work on or before the date stipulated for Substantial Completion, or such later date as may result from extension of time granted by Owner, he shall pay the Owner, as liquidated damages, the sum of One Hundred Dollars ($100.00) for each consecutive calendar day that terms of the contract remain unfulfilled beyond the date allowed by the Contract, which sum is agreed upon as a reasonable and proper measure of damages which the Owner will sustain per day by failure of the Contractor to complete Work within time as stipulated; it being recognized by the Owner and the Contractor that the injury to the Owner which could result from a failure of the Contractor to complete on schedule is uncertain and cannot be computed exactly. In no way shall costs for liquidated damages be construed as a penalty on the Contractor. Project Duration: 90 days from Notice to Proceed Anticipated Project Start Date: February 2023 Project Completion Date: March 31, 2023

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents