Similar Projects
Installation and Procurement of Boiler Feed Pumps For the Carrollton Water Plant - Boiler Room
Renovation
Design
$300,000 CJ est. value
New Orleans, LA 70118

HVAC Repairs - Gernon Brown Rec Center
Renovation
Design
$300,000 CJ est. value
New Orleans, LA 70124

Hot Water Boiler Replacement at Eleanor McMain Secondary School
Renovation
Sub-Bidding
$300,000 CJ est. value
New Orleans, LA 70125

60 Ton Chiller
Renovation
Sub-Bidding
$168,766 CJ est. value
New Orleans, LA 70112

Exterior Duct Work
Alteration
Post-Bid
New Orleans, LA

HVAC RTU Repairs
Renovation
Post-Bid
$19,115 CJ est. value
New Orleans, LA 70117

LEC AHU Equipment Installation (Phase 1)
Alteration
Results
New Orleans, LA

Audubon Aquarium Air Handler Unit Replacements 3.1, 3.10 and 3.13
Renovation
Results
$727,000 CJ est. value
New Orleans, LA 70130

Complete AHU install New Orleans, LA
Renovation
Sub-Bidding
$250,000 CJ est. value
New Orleans, LA 70124

Sanchez Center HVAC Repairs
Renovation
Post-Bid
$300,000 CJ est. value
New Orleans, LA 70117

Boiler Replacement at Guste High Rise
Renovation
Results
$341,000 CJ est. value
New Orleans, LA 70113

Install 30 ton A/C for the fourth bay in the Greenhouse
Renovation
Post-Bid
$250,000 CJ est. value
New Orleans, LA 70124

Furnish and Install Air Handler Replacement Kitchen 1
Renovation
Results
$469,900 CJ est. value
New Orleans, LA 70130

Air Duct Cleaning
Term Contract
Post-Bid
New Orleans, LA 70126

Condenser Fan Motors
Term Contract
Post-Bid
New Orleans, LA 70112

Last Updated 07/25/2023 12:36 PM
Project Title

Corrective Hvac Duct Work & Grille Replacement At the Florida Housing Community

Physical Address View project details and contacts
City, State (County) New Orleans, LA 70122   (Orleans County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Results, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $99,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Question Submittal Deadline Friday, March 24, 2023 HANO is seeking sealed bids from Contractors for replacement of H.V.A.C. return air ducting and return air grille assemblies at the 46 living units (residential apartments) listed below. These living units have 2-ton or 3-ton H.V.A.C. systems, and their return air ducts & grilles seem to be undersized. Some parts of the building have 1 1/2 -ton H.V.A.C. systems and do not require improvement work as a part of this project because their return air ducts and return air grilles do not seem to be problematic. Most or all of the living units shall be occupied, and the Contractor shall minimize disruptions and inconveniences to tenants of these living units. The Contractor shall NOT use any of the tenant's electricity 1. H.V.A.C. systems to receive the specified work, listed by municipal address: a) 2509 Congress St. h) 2527 Congress St. o) 2524 Independence St. b) 2511 Congress St. i) 2508 Independence St. p) 2526 Independence St. c) 2513 Congress St. j) 2512 Independence St. q) 2509 Independence St. d) 2517 Congress St. k) 2514 Independence St. r) 2511 Independence St. e) 2519 Congress St. l) 2516 Independence St. s) 2523 Independence St. f) 2521 Congress St. m) 2520 Independence St. t) 2525 Independence St. g) 2523 Congress St. n) 2522 Independence St. u) 2527 Independence St. v) 2508 Pauline St. ee) 2515 Pauline St. nn) 2514 Alvar St. w) 2510 Pauline St. ff) 2517 Pauline St. oo) 2516 Alvar St. x) 2520 Pauline St. gg) 2519 Pauline St. pp) 2518 Alvar St. y) 2522 Pauline St. hh) 2521 Pauline St. qq) 2520 Alvar St. z) 2524 Pauline St. ii) 2523 Pauline St. rr) 2522 Alvar St. aa) 2526 Pauline St. jj) 2525 Pauline St. ss) 2524 Alvar St. bb) 2509 Pauline St. kk) 2527 Pauline St. tt) 2526 Alvar St. cc) 2511 Pauline St. ll) 2510 Alvar St. dd) 2513 Pauline St. mm) 2512 Alvar St. 2. H.V.A.C. systems at the below-listed living units shall NOT receive work as a part of this project (unless by change order) because corrective work has already been performed at these living units. a) 2515 Congress St. c) 2510 Independence St. e) 2521 Independence St. b) 2525 Congress St. d) 2518 Independence St. f) 2508 Alvar St. PEREZ PROJECT NO.: 01-11-1037-01

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents