Similar Projects
Last Updated | 01/13/2022 03:59 AM |
Project Title | Lincoln ST. - HWY. 67 (Cabot) (S) |
Physical Address | View project details and contacts |
City, State (County) | Cabot, AR (Lonoke County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Purpose of This Project Is to Mill and Overlay Approximately 1.188 Miles of Highway 89 in Cabot, in Lonoke County. This Project Consists of Cold Milling Asphalt Pavement, Achm Patching of Existing Roadway, Achm Surface Course, Maintenance of Traffic, Pavement Marking, and Misc. Items 401011 Tack Coat 5,248.00 Gal 407162 Ma in Achm Surface(1/2") 3,223.00 Ton 407442 Ab(Pg70-22)achm Surf(1/2") 173.00 Ton 412002 Cold Milling Asphalt Pvmt. 30,873.00 Sqyd 415011 Achm Patch.exist.rdwy. 35.00 Ton 601001 Mobilization 1.00 L.s. 603010 Maintenance of Traffic 1.00 L.s. 604003 Signs 892.00 Sqft 604041 Const.pavement Markings 14,258.00 Lf 704036 Loop Wiring Class Iii (1c/16 a.w.g.) 1,978.00 Lf 719002 Thermo.pvmt.mark.wh(6") 10,378.00 Lf 719005 Thermo.pvmt.mark.wh(12") 670.00 Lf 719102 Thermo.pvmt.mark.yl(6") 11,511.00 Lf 719201 Thermo.pvmt.mark.(Word) 9.00 Each 719202 Thermo.pvmt.mark.(Arrow) 16.00 Each 719203 Thermo.pvmt.mark.(Rr Emb.) 4.00 Each 721002 Raised Pavement Markers-2 327.00 Each |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |