Similar Projects
Norton Creek Flood Control - 603-60-22524 - City of Fridley
Infrastructure
Conception
$900,000 CJ est. value
Fridley, MN 55432

Anoka Metro Regional Treatment Center Miller Building Upgrade
Build-out, Renovation, Infrastructure
Conception
$6,600,000 CJ est. value
Anoka, MN 55303

Bridge Repair
Infrastructure
Design
$2,300,000 CJ est. value
Spring Lake Park, MN 55432

Sola Riverdale
New Construction, Infrastructure - 12,296 SF
Design
$3,000,000 CJ est. value
Coon Rapids, MN 55448

Kellys Sample Pool Project
New Construction, Infrastructure
Bidding
$1,000,000 CJ est. value
Anoka, MN 55303

Cloud Drive Signal
Infrastructure
Bidding
$4,000,000 CJ est. value
Blaine, MN 55449

Environmental Services
Term Contract
Post-Bid
Less than $500,000 est. value
Washington, DC

Central Avenue Sewer Manhole Improvements
Infrastructure
Post-Bid
$300,000 CJ est. value
Columbia Heights, MN 55421

Siwek Park Improvements
Renovation, Infrastructure
Results
$375,000 est. value
Saint Francis, MN

ISD 11 High School Multipurpose Fields
New Construction, Infrastructure
Results
Anoka, MN

Andover High School Storage Garage Addition
Addition, Renovation, Infrastructure
Construction
$197,440 CJ est. value
Andover, MN 55304

Radisson Hills
New Construction, Infrastructure
Construction
$18,000,000 CJ est. value
Blaine, MN 55449

Riverdale Commons Seventh Addition / Golden Corral Redevelopment
Demolition, New Construction, Infrastructure - 8,900 SF
Pending Verification
$2,800,000 CJ est. value
Minneapolis, MN 55448

Sanctuary Lofts
New Construction, Infrastructure, Build-out
Pending Verification
$6,600,000 CJ est. value
Minneapolis, MN 55417

Bunker Hills Regional Park Improvements - Anoka County
Infrastructure
Conception
$5,525,589 CJ est. value
Andover, MN 55304

Last Updated 12/29/2022 01:35 PM
Project Title

RFP D/B - Cedar Creek Classroom Expansion

Physical Address View project details and contacts
City, State (County) East Bethel, MN 55005   (Anoka County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Environmental, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected November 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $2,390,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The owner has selected a Design Builder. A timeline for construction has not yet been established. Design-Build Services for classroom expansion at the Cedar Creek Ecosystem Science Reserve's Lindeman Research and Discovery Center. The Cedar Creek Ecosystem Science Reserves Lindeman Research and Discovery Center aims to advance the understanding of natural systems through ecological research. Community engagement is important to their mission, informing environmental policies and promoting biodiversity conservation. The programs have grown over the past decade, now serving over seven thousand K-12 students on ecological field trips each year. With this substantial increase, the amount of student visitors exceeds current classroom spaces and restroom spaces are limited. 1. Program Description - The University is requesting design services for a one classroom addition to the existing Lindeman Center, including restrooms and support space. With students ranging from kindergarten through high school, the classrooms should be designed with flexibility and universal design in mind. Modifications to the existing building will be limited to the circulation connection. 2. Impact Analysis - The addition is not expected to include sprinkler systems, but may be expected to satisfy storm shelter requirements. Further definition in Pre design is required. Respondent should include a new septic system to serve the new fixtures. Scopes of services will include all services and deliverables necessary to complete a Pre design (Programming), Schematic Design, Design Development, Construction Documents, Bidding/ Negotiation and Construction Administration. Establish a preliminary scope of work/ statement, construction cost estimate and implementation/ phasing schedule for the project. Deadline for RFP Questions November 21, 2022 at Noon

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents