Similar Projects
FY23 Savannah Inner Harbor Dredging
Infrastructure
Sub-Bidding
$100,000,000 CJ est. value
Savannah, GA 31401

Janitorial and Industrial Supplies
Term Contract
Sub-Bidding
Albany, GA 31701

Environmental Support Services
Infrastructure
Post-Bid

Environmental Support Services
Infrastructure
Post-Bid

Southside Trail (SST) Soil Remediation
Infrastructure
Results
Atlanta, GA

Asbestos Abatement Services
Alteration
Results
GA

2023 Full Depth Reclamation and Paving on Various Streets
Term Contract
Sub-Bidding
Duluth, GA 30096

Pre-Demolition Asbestos Survey
Demolition, Infrastructure
Post-Bid
Homerville, GA 31634

Demolition and Asbestos Abatement of Structures at 2123 Parkwood Road
Demolition, Alteration
Results
$10,800 est. value
Snellville, GA 30078

Macon-Bibb County Law Enforcement Center Air Quality Improvements
Renovation
Sub-Bidding
$150,000 CJ est. value
Macon, GA 31201

Abatement and Demolition Services
Addition, Demolition
Post-Bid
GA

Asbestos Abatement, Demolition and Debris Removal - Annual Contract
Term Contract
Results
South Fulton, GA

MG Holly Springs Rd and Hog Liver Rd elevated storage tanks
Infrastructure
Sub-Bidding
$400,000 CJ est. value
Carrollton, GA 30117

Pre-Demolition Asbestos Survey
Alteration
Post-Bid
Milledgeville, GA 31062

Demolition of Building
Demolition, Infrastructure
Results
$45,000 CJ est. value
East Ellijay, GA 30540

Last Updated 04/26/2023 09:01 AM
Project Title

Demolition of (2) Warehouse Buildings

Physical Address View project details and contacts
City, State (County) Waynesboro, GA 30830   (Burke County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $49,500 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Burke County Board of Commissioners is accepting bids for the demolition and removal of (2 each) Warehouse Buildings and adjoining loading dock located on the corner of Myrick St and Barron St in Waynesboro, GA. SCOPE: (contractor is responsible for the following) Field verify all existing conditions prior to submitting a bid. Demolition and Removal of (2) existing pole barn style warehouse buildings. Demolition and Removal of concrete loading dock on rear side of warehouse buildings. Building demolition to include but not limited to: metal roofing, metal siding, fire sprinkler piping and risers, electrical, masonry, all wood structures, concrete slab/paving, and any other construction material adjoining to these two buildings. Please note: if there is any material that can be salvaged, this value should be credited to the total bid price. Burke County reserves the right to keep any of the building materials removed which they deem useful. The site should be clear of all debris and rubble at completion and elevations should be graded to allow for proper water shed. Please include copies of your Company's W9, General Liability and Worker's Comp Insurance.

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents