Similar Projects
Lockwood Folly Park Facilities - Brunswick County
Infrastructure
Conception
$3,800,000 CJ est. value
Bolivia, NC 28422

Bolivia By-Pass Transmission Force Main - Brunswick County
Infrastructure
Conception
$13,715,000 est. value
Bolivia, NC

Walmart Supercenter #2772-242 - Smart Bundle
Renovation - 154,015 SF
Design
Southport, NC 28461

Walmart Supercenter #4274-276 - Smart Bundle
Renovation - 203,820 SF
Design

Boiling Spring Lakes Dams Construction/Re-Construction Project
Infrastructure
Bidding
$28,046,648 CJ est. value
Boiling Spring Lakes, NC 28461

Boiling Spring Lakes Dams Construction/Re-Construction Project
Infrastructure
Bidding
$28,046,648 CJ est. value
Boiling Spring Lakes, NC 28461

Ash - Waccamaw Multiuse Building - Brunswick County
New Construction, Infrastructure
Post-Bid
$5,000,000 CJ est. value
Ash, NC 28420

Olde Waterford Way Roadway Extension
Infrastructure
Post-Bid
Leland, NC

2021 Street Resurfacing
Results
Sunset Beach, NC

Fifty Lakes Drive and South Shore Drive Road Improvement Project
Infrastructure
Results
$300,000 est. value
Boiling Spring Lakes, NC 28461

Arbor Landing at Compass Pointe
New Construction, Infrastructure
Pending Verification
$4,417,660 CJ est. value
Leland, NC 28451

Arbor Landing at Compass Pointe
New Construction, Infrastructure
Pending Verification
$4,417,660 CJ est. value
Leland, NC 28451

Northwest District Park - Brunswick County
Infrastructure
Conception
$5,690,000 CJ est. value
Leland, NC 28451

Walmart Supercenter #1767-244 - Smart Bundle
Renovation
Design
Shallotte, NC 28470

Offices and Shoppes at Waterford - Building A
New Construction, Infrastructure - 39,005 SF
Bidding
$10,000,000 CJ est. value
Leland, NC 28451

Last Updated 02/06/2023 06:03 PM
Project Title

Offices and Shoppes at Waterford - Building B

Physical Address View project details and contacts
City, State (County) Leland, NC 28451   (Brunswick County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Office, Paving/Reconstruction, Retail, Site Development
Contracting Method Bids by Invitation
Project Status Schematic Drawings, Construction start expected April 2024
Bids Due View project details and contacts
Estimated Value $10,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of a two-building commercial development with associated site work. As of February 6, 2023, the first building of this development is out to bid. A timeline for the second building is not yet known.

Details

3 Stories Above Grade, 39,005 SF.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Doors and Frames, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Loading Dock Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents