Similar Projects
Childrens Justice Center Tile Facade Repair
Bidding
Farmington, UT 84025

SR-163; Mexican Hat Arch Rehabilitation, 0C 274
Bidding
$1,500,000 to $3,000,000 est. value
UT

Work Force Services Stairwell and Handrail Replacement
Post-Bid
Ogden, UT 84401

Jordan High School Stair Treads and Installation
Post-Bid
Sandy, UT

Gallivan Plaza Deck Joint Replacement
Results
Less than $80,000 est. value
Salt Lake City, UT

Eastwood North Interior Coating Project
Results
Less than $175,000 est. value
Salt Lake City, UT

Davis School District High School Stage Rigging Systems Replacement
Construction
Layton, UT 84041

WPAV Chapel Redrock Room - Framing, Sheetrock and Ceilings TI
Bidding
$85,000 est. value
Salt Lake City, UT 84129

Gutter Repair for Davis Community Housing Authority
Term Contract
Post-Bid
UT

Outdoor Rated Enclosures
Results
Less than $50,000 est. value
Salt Lake City, UT

Repair Education Building Deck at Weber Basin Job Corps Center
Bidding
$25,000 to $100,000 est. value
Ogden, UT 84405

Oakdale Elementary and Quail Hollow Elementary School Day Lighting Upgrades
Post-Bid
Sandy, UT 84093

Exterior Sealant Replacement
Results
Less than $450,000 est. value
Salt Lake City, UT 84123

Social Hall Stucco Repairs
Post-Bid
Saint George, UT

Security Entrance Remodel at Fort Herriman Middle School
Results
Herriman, UT 84096

Last Updated 10/23/2019 06:36 PM
Project Title

JATC South Wall Extension and New Classroom

Physical Address View project details and contacts
City, State (County) Riverton, UT 84065   (Salt Lake County)
Category(s) Single Trades
Sub-Category(s) Finishes/Exterior
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description The scope Work for JATC South wall extension and new classroom 1. Extend walls to the ceiling in three classrooms on the second floor per drawing. 2. Install new wall, relocate door, and add door to enclose room on first floor making it a classroom per drawing. 3. Relocate components of systems (electrical, plumbing, mechanical, etc.) that are affected by the remodel per drawing. 4. Provide plastic enclosure to keep the dust in the area of construction. 5. Provide covering for the flooring to protect from damage with the use of lifts and or other equipment. 6. Work with school for staging location of construction material, equipment, and debris for the duration of the project. 7. Keep areas around construction free and clear of material and debris to maintain a safe site for students and public. 8. Contractor to provide all lifts and equipment to complete the project.
Details
Division 09 - Finishes.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents