Similar Projects
CTA Tram, Bike and Pedestrian Bridge
New Construction
Design
Gulfport, MS

Craft Road Bridge and Approaches
New Construction, Infrastructure
Bidding
Olive Branch, MS 38654

Moran Road Bridge Replacement Project
New Construction, Infrastructure
Bidding
Gulfport, MS 39503

Washington Avenue Bridge Replacement Project
Renovation
Post-Bid
Pascagoula, MS 39568

Local System Bridge Program
Renovation
Post-Bid
Lexington, MS

Bridge Preservation
Results
MS

Bridge Repair
Results
MS

Bridge and Approaches
New Construction, Infrastructure
Bidding
Caledonia, MS 39740

Local System Bridge Program - South Pleasant Hill Road
Post-Bid
MS

Bridge Preservation
Results
MS

Bridge Painting on I-20 over Valley Street (Bridge Nos. 44.1A and 44.1B) and on I-55 over Mcdowell Road (Bridge No. 90.7)
Renovation, Infrastructure
Bidding
MS

Highway 80 Bridge Repair and Replacement
Renovation
Post-Bid
Meridian, MS

Bridge Preservation on US 49 Over the Biloxi River (Bridge No. 13.8A)
Results
MS

Bridge Replacements on SR 9 (Bridge Nos. 35.5, 40.7, 40.9 and 41.2)
New Construction, Infrastructure
Bidding
MS

Bridge Replacements on Blackwood Road
Post-Bid
Sunflower, MS 38737

Last Updated 02/24/2022 04:46 AM
Project Title

Bridge Repair on SR 315 over the Yocona River (Bridge No. 60.7)

Physical Address View project details and contacts
City, State (County) MS   (Lafayette County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Bridge Repair on SR 315 over the Yocona River (Bridge No. 60.7), in Lafayette County. Bridge Items 894 Ton 815-A002 Loose Riprap, Size 100 5,583 Ton 815-A007 Loose Riprap, Size 300 2,789 Square Yard 815-E001 Geotextile under Riprap 1,813 Linear Feet 907-808-A002 Joint Repair 196 Linear Feet 907-808-A003 Joint Repair Without Epoxy 784 Linear Feet 907-823-A001 Preformed Joint Seal, Type I 221 Linear Feet 907-823-A002 Preformed Joint Seal, Type II 1,372 Linear Feet 907-823-B001 Saw Cut, Type I 442 Linear Feet 907-823-B002 Saw Cut, Type II 22 Square Feet 907-824-PP003 Bridge Repair, Epoxy Repair 39 Each 907-824-PP006 Bridge Repair, Cap Cleaning 1 Each 907-824-PP006 Bridge Repair, Riser Repair 99 Linear Feet 907-824-PP008 Bridge Repair, FRP Wrap Caps 70 Linear Feet 907-824-PP008 Bridge Repair, FRP Wrap Piles Roadway Items 1 Lump Sum 618-A001 Maintenance of Traffic 10 Square Feet 618-B001 Additional Construction Signs 1 Lump Sum 620-A001 Mobilization

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents