Similar Projects
6200 South Zone C Pump Station
Term Contract
Post-Bid
West Jordan, UT 84081

Stonebridge Maintenance Variable Speed Pump Station Replacement
Post-Bid
West Valley City, UT 84120

900 North Lift Station Rehabilitation
Results
Less than $1,257,000 est. value
Salt Lake City, UT 84115

Airport Pump Station Pump 5 and Motor Installation
Results
West Jordan, UT 84088

Industrial Lift Station Rehab and Piping Upgrades
Post-Bid
Salt Lake City, UT

New Rose Park Lift Station Replacement (SS02)
Results
Less than $419,000 est. value
Salt Lake City, UT 84116

Zone 2 and 3 Pump Station and Pipeline Project
Post-Bid
Herriman, UT 84096

Rosecrest Pump Station Improvements Project
Results
Less than $998,000 est. value
Herriman, UT 84096

20E Pioneer WWPS Replacement Project
Renovation
Post-Bid
$1 to $3,400,000 est. value
West Valley City, UT

Pump Replacement for JBM Pump Station
Results
Less than $198,844 est. value
Herriman, UT

20D: Kent Booster Pump Station Replacement Project Contractor Prequalification
Renovation
Post-Bid
West Valley City, UT 84120

SLC WRF Influent Pump Rebuild Project
Results
Less than $369,000 est. value
Salt Lake City, UT

Jack and Bore-Lift Station CM-GC
New Construction, Infrastructure
Post-Bid
Salt Lake City, UT 84129

River Oaks Pump Station
Results
Sandy, UT

Zone 3 Secondary Booster Pump Station Project
New Construction
Post-Bid
Salt Lake City, UT

Last Updated 12/10/2021 07:20 AM
Project Title

Mulligans Pump Station

Physical Address View project details and contacts
City, State (County) South Jordan, UT   (Salt Lake County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope: The Project will consist of the construction and installation of a secondary irrigation pump system, installation of pond inlet pipe and wet well box, electrical connection and pump installation, demolition of existing pump structure, and associated site improvements. The project also includes the furnishing and installation of all materials; all labor; supplies; tools, equipment, parts, rentals, fuels, utilities, subcontractors, suppliers, mobilization and all other cost including overhead and profit necessary to complete the project based on construction plans per APWA standards and City specifications.

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents