Similar Projects
Milledgeville Streetscape - Phase IV
Results
Milledgeville, GA

Gwinnett Street Widening
Results
Savannah, GA

Tradeport East Rough Grading and Drainage Improvements
Results
Less than $563,843 est. value
GA

Phase I Entrance Road
Results
Savannah, GA 31400

Mobley Park Storm Drainage Improvements
Results
Port Wentworth, GA

Jekyll Island Road Resurfacing
Results
Jekyll Island, GA 31527

Southern Region Disaster Recovery Support BPA
Results

Last Updated 07/29/2020 09:40 AM
Project Title

Roadway and Drainage Improvement

Physical Address View project details and contacts
City, State (County) Warrenton, GA 30828   (Warren County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Approximately 400 tons of asphalt paving, 1,700 linear feet curb and gutter,1,175 linear feet 18-inch storm pipe, 290 linear feet 24-inch storm pipe, 405 linear feet 36-inch storm pipe, grading, demolition, road widening, utility relocation, and all appurtenances associated with project construction

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents