Similar Projects
Japanese House Addition - Ogura - Sato Annex
Addition - 6,250 SF
Conception
$3,350,000 est. value
Urbana, IL 61802

Library Expansion
Renovation, Addition - 28,000 SF
Conception
Mahomet, IL

A & E Multiple Award Task Order Contract (MATOC)
Design
$3,500 to $100,000,000 est. value

A & E Multiple Award Task Order Contract (MATOC)
Design
$3,500 to $100,000,000 est. value

Construction Inspection IDIQ (MATOC)
Post-Bid
Less than $100,000,000 est. value

Construction Inspection IDIQ (MATOC)
Post-Bid
Less than $100,000,000 est. value

Water Tank Inspections, OCONUS and CONUS
Results
$10,000 to $5,000,000 est. value

Water Tank Inspections, OCONUS and CONUS
Results
$10,000 to $5,000,000 est. value

Ubben Basketball Complex Expansion BP 2
Addition
Construction
Champaign, IL 61820

Ubben Basketball Complex Expansion Bid Package 3
Addition
Construction
Champaign, IL 61820

Swine Center Upgrade
Renovation
Conception
$18,000,000 est. value
Champaign, IL 61822

Central Region AE IDIQ
New Construction, Term Contract
Design
$25,000,000 est. value

Rapid Response Engineering Services
Term Contract
Post-Bid
Champaign, IL 61820

USDA Forest Service Eastern Region Architect & Engineer Services IDIQ
Results
$2,500 to $5,000,000 est. value

Swine Research Center Modernization
New Construction - 10,000 SF
Conception
$12,600,000 est. value
Champaign, IL 61822

Last Updated 03/18/2022 09:41 AM
Project Title

Construction Management Services for Undergraduate Library Redevelopment

Physical Address View project details and contacts
City, State (County) Champaign, Urbana, IL 61801   (Champaign County)
Category(s) Education, Professional Services
Sub-Category(s) Architectural, College/University, Engineering
Contracting Method Competitive Bids.
Project Status Project to Rebid
Bids Due View project details and contacts
Estimated Value $50,198,160
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project will begin with Construction Documents to better define the scope, schedule, cost and project delivery method. It is the University's intent to contract with the CM for the Pre-Construction Services phase. It is the University's intent to utilize the same CM firm upon approval by the University of Illinois Board of Trustees for the remainder of the project for Bidding and Construction phases. Outline of Consultant Services: Consultant services required under this contract may include, but is not limited to, the following: Construction Document Phase: • During this phase, the Construction Manager will perform full construction management services including, but not limited to, reviewing PSC drawings, schedules and estimates; developing estimates and schedules independent of PSC; providing a detailed estimate and review of all field directives and change order proposals, making recommendations to contractors; coordinating construction activities, and maintaining budget and schedule throughout the project. • The Construction Manager deliverables will also include 50% CD and 95% CD estimates, with value engineering incorporated from the 50% CD review. Amendment Scope (Bidding & Construction Administration Phases): · During these phases, the Construction Manager will perform full construction management services including, but not limited to, reviewing PSC drawings and schedules and estimates; developing estimates and schedules independent of PSC; providing a detailed estimate and review of all field directives and change order proposals, making recommendations to contractors; coordinating construction activities, and maintaining budget and schedule throughout the project .

Details

College/University, New Construction.
Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents