Similar Projects
Bowie High School - Phase 4 - 2019 Bond - Arlington Independent School District
Addition, Infrastructure, Renovation
Conception
$13,295,613 CJ est. value
Arlington, TX 76018

Phase 5 School Bond Renovation
Renovation, Addition
Conception
Arlington, TX

Early Childhood Center
New Construction, Renovation - 97,400 SF
Design
Gregory, TX 78359

New Middle School #5
New Construction
Design
Prosper, TX

New High School and Multiple Additions, Modifications and Upgrades at Seven Other Campuses
New Construction, Addition - 48,000 SF
Post-Bid
Less than $10,200,000 est. value
Nederland, TX 77627

Brushy Creek Elementary School
Post-Bid
$8,335,992 est. value
Round Rock, TX 78681

Construction Management at Risk - Multiple Projects Package 2019-2
Addition
Results
Mesquite, TX 75150

Holbrook and Post Elementary School and Kahla Middle School Renovations
Renovation
Results
Less than $5,100,000 est. value
Houston, TX 77084

Hunters Creek Elementary School Replacement
New Construction - 108,000 SF
Construction
Less than $22,000,000 est. value
Houston, TX 77024

Construction Management Services 2018 Bond Program PKG009 Elementary School 53
New Construction
Construction
Less than $32,282,486 est. value
Missouri City, TX

W W Bushman Elementary School - 2020 Bond - Dallas Independent School District
Renovation, Infrastructure
Pending Verification
$30,986,820 CJ est. value
Dallas, TX 75216

New Elementary School Bastrop
New Construction
Conception
Bastrop, TX 78602

DISD - MLK Arts Academy
Renovation - 60,000 SF
Design
$4,000,000 est. value
Dallas, TX 75215

Job Order General Construction Contracts
Post-Bid
Corpus Christi, TX 78401

Construction Manager-at-Risk, Two-Step Process
Renovation
Results
Aledo, TX 76008

Last Updated 10/26/2022 11:08 AM
Project Title

New Community Center Renovations

Physical Address View project details and contacts
City, State (County) Huntsville, TX 77340   (Walker County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids
Project Status Schematic Drawings, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $1,875,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of October 26, 2022, this project is in conceptual design with schematic drawings. An Architect has been selected. A general contractor has not been disclosed. Although a firm timeline is not available, the construction is not likely to start until October 2023.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents