Similar Projects
Coal Avenue Commons Construction - 33173 - City of Gallup
Infrastructure
Conception
$2,677,000 CJ est. value
Gallup, NM 87301

Coal Avenue Commons Construction - 33173 - City of Gallup
Infrastructure
Conception
$2,677,000 CJ est. value
Gallup, NM 87301

Constructing a Track and Field at Bureau of Indian Education (BIE)
Infrastructure
Design
$600,000 CJ est. value
Crownpoint, NM 87313

BIA Chi Chil Tah Jones Ranch Community School Replacement and Quarters Project - Design-Build
New Construction, Infrastructure - 68,120 SF
Bidding
$10,000,000 CJ est. value
Vanderwagen, NM 87326

Construction of Water System Improvements Project Phase 1, NM 118 Waterline
Infrastructure
Bidding
$763,200 CJ est. value
Gallup, NM 87301

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Paving Services
Results
Gallup, NM

118 Waterline and Ford Drive Sewer Line and Concrete Paving Replacement
Infrastructure
Results
Gallup, NM 87301

Dollar General / Farmington
New Construction, Infrastructure - 10,640 SF
Pending Verification
$1,000,000 CJ est. value
Ramah, NM 87321

Dollar General / Farmington
New Construction, Infrastructure - 10,640 SF
Pending Verification
$1,000,000 CJ est. value
Ramah, NM 87321

West Logan Avenue Improvements - 37222 - City of Gallup
Infrastructure
Conception
$825,000 CJ est. value
Gallup, NM 87301

Construction of Navajo Gallup Water Supply Project Reach 27.7B
Infrastructure
Bidding
$4,000,000 CJ est. value
Gallup, NM 87301

Heavy Equipment Maintenance, Repairs
Infrastructure
Post-Bid
Mentmore, NM

BOR ICI Water Meter Replacement
Infrastructure
Results
Gallup, NM

Last Updated 01/19/2023 10:12 AM
Project Title

West Logan Avenue (6th to 9th Street) Street and Drainage Project

Physical Address View project details and contacts
City, State (County) Gallup, NM 87301   (McKinley County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $1,253,672 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of Jan 10 the project was awarded to H.O Construction Inc for $1,253,672.42. Project is located in the Southwest part of Gallup New Mexico in an area known as Chihuahuita by the locals. The intent of the project is to reconstruct the existing road to a grade that will alleviate localized flooding that occurs in the area and to provide ADA accessibility routes. Reconstruction shall encompass the removal and reinstallation of all concrete flat work, and installation of a new wear surface within the City Right-Of-Way between 7th and 9th Street. In addition, the City has elected to replace the existing water and sewer mains including manholes, fire hydrants and service lines within this same area. It will be incumbent on the Contractor to ensure that all utility services and entrances to the residents' homes is maintained at all times during construction. Temporary service lines shall be installed, as needed, by the Contractor. Installation and maintenance of these temporary lines shall be incidental to the project and will not be paid for under a separate line item. Two additive alternates are included in this project: 1.Extend reconstruction of the existing road grade to 6th street. Work shall be similar to that described above excluding any main line utility work. Work shall require vertical adjustment of existing water meters, relocation of existing permanent signage, replacement of existing fire hydrant and regrading of existing water meters and valve cans. 2.Construct a concrete stairwell, including handrails, at the intersection of Logan Avenue and 7th Street. Work shall include, but is not limited to, clearing and grubbing, rock removal and disposal and extending flatwork to the east as indicated in the contract drawings. Replacement of curb and gutter shall not be included in this work. This project is to be funded in part by a Community Development Block Grant.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents