Similar Projects
Doolittle Elementary School Boiler Replacement
Bidding
Cheshire, CT 06410

J--Boiler Services VA Medical Centers New England
Post-Bid
Hartford, Newington, West Haven, CT - Bedford, Jamaica Plain, Leeds, MA - Manchester, NH - Providence, RI 06111

J043--PM for Boiler Air Compressor
Post-Bid
West Haven, CT

REPLACE BOILERS - Paul J. Sutcovoy USARC - Lydia Street EXT, Waterbury, CT 06705
Results
$25,000 to $100,000 est. value
Waterbury, CT 06705

Replacement of 2 Boilers at John G. Prendergast School
Results
$200,000 to $300,000 est. value
Ansonia, CT 06401

Walsh Boilers Replacement
Post-Bid
Waterbury, CT 06704

Cafeteria Renovations Highland School (Replace Government Freezer)
Results
Cheshire, CT 06410

J048--Sources Sought Notice Steam Station Safety Relief Valve
Post-Bid
West Haven, CT 06516

High Plains Community Center Boiler Replacement
Results
Less than $40,160 est. value
Orange, CT 06477

CHMS Boiler Removal and Replacement
Post-Bid
Naugatuck, CT 06770

Fire Head Quarters (HQ) Boiler Replacement Design Services
Results
Cheshire, CT 06410

Western School (WES) Boiler Removal and Replacement
Post-Bid
Naugatuck, CT 06770

Boiler Replacements at the Cheshire Fire Headquarters and Fire Headquarters Annex
Results
Cheshire, CT 06410

Highland Elementary School Boiler and Domestic Hot Water Replacement
Post-Bid
Cheshire, CT 06410

Nathanael B. Greene Community Center Boiler Replacement
Results
Guilford, CT 06437

Last Updated 11/09/2020 03:40 PM
Project Title

N045--Install of 90 Thermal Mixing Valves in Building 2

Physical Address View project details and contacts
City, State (County) West Haven, CT 06516   (New Haven County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Install of 90 Thermal Mixing Valves in building 2: Connecticut VAMC Facilities – Installation of 90 Thermal Mixing Valves at the West Haven campus. Installation of 90 Chicago Thermal Flushable Thermostatic Mixing Valves Installation of 90 VA provided Chicago Thermal Flushable Thermostatic Mixing Valves in the following locations: Building 2: G119 1128 1280 2114 3104 5209 7180 G120 1101 1282 2107F 4133 5186 7205A 1210 1352 2240 3209 4135 5184 1210A 1351 2245 3185 4104 5217 1239 1330 2246 3168 4214 5223 1240 1300 2177 3217 4184 7128 1261 1288B 2178 3223 4223 7129 1213 1288A 2155 3150 5153 7156 1205 1287 2154 3108 5155 7178 1160 1286 2115 3131 5202 7181 Mixing valves to be installed completely under sink to the right side of sink drain, above cold water supply angle stop and as high as possible while still maintaining ability to operate thermal flushing bypass button and temperature adjustment knob and antitamper locking screw. Mixing valves to be hung using plastic anchors and screws. Plastic anchors being installed through porcelain or ceramic tile must be drilled using a tile bit to go through the tile. Stainless Steel Braided Flex tubing and hard copper tubing (chrome tubing where exposed) to be used to connect mixing valves from water supply and to sink. All tubing installation must be bent professionally, presentably as straight and square a possible. Upon completion of each individual mixing valve install the mixing valve piping will be thoroughly inspected for leaks and mixing valve set for water temperature to be between 100 degrees Fahrenheit and 110 degrees Fahrenheit.

Details

Division 33 - Utilities, Water Utility Distribution Equipment, Water Utility Distribution Valves.
Division 40 - Process Integration, Bulk Materials Valves, Primary Control Devices, Primary Control Valves.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents