Similar Projects
Arlington Boathouse - Arlington County
New Construction, Infrastructure
Conception
$18,695,000 CJ est. value
Arlington, VA 22209

Columbia Pike Library Replacement - Arlington County
New Construction, Infrastructure
Conception
$31,650,000 CJ est. value
Arlington, VA 22203

Joyce Motors Mixed-use Redevelopment / 10th and Irving
New Construction, Infrastructure - 185,000 SF
Design
$25,000,000 CJ est. value
Arlington, VA 22201

Bus Bay Expansion - East Falls Church Metro Station - Arlington County
Addition, Infrastructure
Design
$7,717,000 CJ est. value
Arlington, VA 22205

RFQ D/B - Pentagon Commercial Inspection Facility
New Construction, Infrastructure
Bidding
$25,000,000 CJ est. value
Arlington, VA 22202

Sewer Rehabilitation Services
Infrastructure
Bidding
$400,000 CJ est. value
Arlington, VA 22201

RFQ Contractor - Phlipott Landslide Construction
Infrastructure
Post-Bid
$10,000,000 CJ est. value
Bassett, VA 24055

Virginia State University Academic Commons Building Project
Demolition, Renovation, Infrastructure - 174,000 SF
Post-Bid
$100,000,000 CJ est. value
Petersburg, VA 23803

Alcova Heights Park Renovation Phase 1
Renovation - 828 SF
Results
Arlington, VA 22204

Main Entrance Relocation and Renovations to Gunston Middle School
Renovation
Results
Arlington, VA 22206

Kitchen and Entrance Renovations - Arlington Traditional Elementary School
Renovation - 4,153 SF
Construction
$1,000,000 to $2,999,999 est. value
Arlington, VA 22205

Crystal City Water Park
Renovation
Construction
$10,000,000 est. value
Arlington, VA 22202

223 23rd Street Mixed-Use
New Construction, Infrastructure - 31 SF
Pending Verification
$125,000,000 CJ est. value
Arlington, VA 22202

223 23rd Street Mixed-Use
New Construction, Infrastructure - 31 SF
Pending Verification
$125,000,000 CJ est. value
Arlington, VA 22202

East Falls Church Metro Station Second Entrance - Arlington County
Addition, Infrastructure
Conception
$96,062,000 CJ est. value
Arlington, VA 22205

Last Updated 05/09/2023 03:23 PM
Project Title

The Heights Building Phase 2 - Garage Addition, Field, and Accessibility Site Work

Physical Address View project details and contacts
City, State (County) Arlington, VA 22209   (Arlington County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Middle/Senior High School, Park/Playground, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $12,495,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The Heights Building Phase 2 - Garage Addition, Field, and Accessibility Site Work All questions regarding this solicitation, other than those submitted at the Conference, must be submitted in writing via email, addressed to Brandon Christian, Procurement Office, Senior Procurement Specialist, at brandon.christian@apsva.us, with copies to Robin Hodges, Facilities and Operations, Senior Project Manager, at robin.hodges@apsva.us and Teresa Hamm-Modley, Owner's Representative (Architect), at hammmodley@vmdo-dc.com. Questions must be received by 5:00 P.M. local time, February 20, 2023. Bids shall be accompanied by a certified check, cashier's check, cash escrow or a Bid bond in an amount not less than five percent (5%) of the amount of the Total Bid as a guarantee that if the Contract is awarded to the Bidder within the later of one hundred and twenty (120) days following Bid Opening or one hundred and twenty (120) days following issuance by the Owner of a Notice of Intent to Award to the Bidder, it will enter into the Contract for the Project mentioned in the Bid at the amount of the Bid and provide any required performance and payment bonds. The amount of any performance or payment bonds will be determined based on the Contract Price at the time of award, and is subject to adjustment thereafter as provided in the Contract Documents. The obligee or payee on all bonds shall be Arlington Public Schools Arlington Public Schools reserves the right to cancel this Invitation to Bid and to reject any and all Bids, and to waive any informality in any Bid received. 1. Selective demolition site work including but not limited to: - Concrete and masonry - Synthetic Turf with Musco lighting - Partitions, doors, frames, flooring, ceilings - Wall mounted accessories and other items noted - Storefront - Temperature Controls, Electrical, Plumbing Systems - Fire alarm device/cabling and Sprinkler - Dewatering delegated design - Asphalt and striping repairs - Driving/Boring Piles and crane operations 2. Modifications to the existing building include new: - Tie ins to the fire alarm system and new graphic - Tie ins to the sprinkler system - Tie ins to the electrical power - Tie ins to the HVAC Controls - Tie ins to the Security System - New entrance - Restoration of existing finishes disturbed or damaged by tie ins and adjacent work

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Selective Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents