Similar Projects
Highway 47 and Highway 50 Intersection Development
Alteration
Design
$5,300,000 est. value
Union, MO 63084

Agricultural Building - Union R-XI School District
New Construction, Infrastructure - 20,000,000 SF
Design
$5,400,000 CJ est. value
Union, MO 63084

2023 Overlay Project
Infrastructure
Bidding
$1,005,400 CJ est. value
Washington, MO 63090

2023 Overlay Project
Infrastructure
Bidding
$1,005,400 CJ est. value
Washington, MO 63090

Owner's Representative - Construction Projects
New Construction
Post-Bid
Sullivan, MO

MODOT Statewide Annual Plant (Cold) Mix Oil Material - Premix
Infrastructure
Post-Bid

2021 Fairgrounds Paving Improvements
Infrastructure
Results
Washington, MO

Fourth Street and Fair Street Overlay Project
Infrastructure
Results
Washington, MO 63090

Lux Living South Kingshighway Boulevard Mixed-Use
Demolition, New Construction, Infrastructure
Pending Verification
$51,000,000 CJ est. value
Saint Louis, MO 63110

Lux Living South Kingshighway Boulevard Mixed-Use
Demolition, New Construction, Infrastructure
Pending Verification
$51,000,000 CJ est. value
Saint Louis, MO 63110

Aurora Estates Senior Living
New Construction, Infrastructure
Design
$11,200,000 CJ est. value
Pacific, MO 63069

Job Order Contract for Asphalt Pavement Repair
Infrastructure
Post-Bid
$100,000 to $250,000 est. value

Hot Mix Overlay - Diederich, Aunt Mary 'S, Lyon School and Project Roads
Infrastructure
Results
MO

The Willows At The Lakes
New Construction, Infrastructure
Pending Verification
$12,000,000 CJ est. value
Washington, MO 63090

Union R-XI High School Greenhouse Replacement
Demolition, New Construction, Infrastructure
Post-Bid
$75,000 CJ est. value
Union, MO 63084

Last Updated 12/12/2022 01:04 PM
Project Title

dupeTransportation Facility Expansion - Rockwood School District

Physical Address View project details and contacts
City, State (County) Wildwood, MO 63069   (Franklin County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $900,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

*The owner requests that all subcontractor / supplier inquiries be directed to the GC Bidder. *As of November 16, 2022, civil scope work has been added The work of this contract comprises the Rockwood School District Transportation Facility Expansion, Wildwood Location, Eureka Missouri. B. Construct the work under a stipulated sum contract. C. All work on the project, shall be executed as part of the work of this contract. REQUESTS FOR SUBSTITUTIONS OF MATERIALS MUST BE MADE IN WRITING NO LATER THAN 5:00 P.M. CST ON THURSDAY, DECEMBER 15, 2022. REQUESTS SUBMITTED AFTER THAT DATE WILL NOT BE CONSIDERED.

Details

1 Story Above Grade, 4,145 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents