Similar Projects
Wilson Hall Electrical Upgrades and Screen Wall
Alteration
Bidding
Norfolk, VA 23504

NATO HQ SACT Solar Power System Installation and LED Lighting Conversion for Headquarters Supreme Allied Command Transformation
Post-Bid
Norfolk, VA 23551

Electrostatic Disinfection Services
Term Contract
Post-Bid
Less than $71,000 est. value
Norfolk, VA 23504

Moores Bridges WTP Flocculator Drive Replacement
Results
$1,100,000 est. value
Norfolk, VA 23510

Small Machinery and Electrical Services
Results
Norfolk, VA 23510

Replace Electrical Switchgear, Pier 12
Post-Bid
$1,000,000 to $5,000,000 est. value
Norfolk, VA

Generator Replacement for Harrison Opera House
Results
Norfolk, VA

Replace Secondary Switchgear, Pier 8
Post-Bid
$500,000 to $1,000,000 est. value
Norfolk, VA

Moores Bridges Water Treatment Plant Transformers and Cable Replacement
Results
Norfolk, VA 23502

Repair or Replacement of Generator Circuit Breaker
Post-Bid
Norfolk, VA 23511

Electrical and Lighting Repair/Replacement IDQ FY21
Term Contract
Results
Norfolk, VA 23510

UPS and Power Strip
Alteration
Post-Bid
Norfolk, VA

Radio Station Stereo Generator
Results
$14,072 est. value
Norfolk, VA 23504

SDA Area-Repair Pole Line
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value
Norfolk, VA 23551

Electrical Maintenance and Repair
Term Contract
Results

Reported 09/09/2021 12:00 AM
Project Title

Repair and Replace Fiber Cables Service

Physical Address View project details and contacts
City, State (County) Norfolk, VA   (Norfolk City County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor will pull approximately 1500 feet of 48 SM fiber through existing conduit path from Building 145 to Building 390. The existing path includes: 4 Manholes, and 3 Hand Holes. Contractor will leave 100’ coil at building 145. Contractor will leave 50’ coil at Building 390. Contractor will leave 3 each, 50’ maintenance loops with locations as defined on Work Print. Contractor will terminate fibers in patch panels at each end with LC connectors and test. All services and materials will be provided by contractor.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents