Project Title | Mill and Overlay of Firestone Boulevard and Colorado Boulevard |
Physical Address | View project details and contacts |
City, State (County) | Firestone, CO 80504 (Weld County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | Less than $682,077 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Work for which the Bid is requested consists of a two inch mill and overlay of Firestone Boulevard from Oak meadows Boulevard to Cimarron Street, both east and west bound lanes, and a two inch mill and overlay of Colorado Boulevard from Cimarron Street to Oak Meadows Boulevard, both north and south bound lanes. Re-striping and replacement of Thermoplastic markings for the area that has been overlayed. The Town requires all millings to be taken to the Public Works yard. All Towns Standards and Specifications to be followed to include the procedures outlined in the Town’s Street, Curb, and Gutter Maintenance/Replacement SOP to ensure stormwater compliance including installation and maintenance of stormwater control measures. Bidder to bid the project as day work, with an add/deduct alternate for night work. Include crack mitigation and sub-base repair unit prices in the bid alternate section. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |