Similar Projects
Crack Sealing Contract
Infrastructure
Conception
$4,650,000 CJ est. value
N Merrick, NY 11566

I 495 Pavement Rehab Ex 32 to 48
Infrastructure
Conception
$35,000,000 CJ est. value
Old Westbury, NY 11568

WSP at Old Country Rd Ramp Impvt
Infrastructure
Design
$4,150,000 CJ est. value
Carle Place, NY 11514

AutoZone #6872 / Westbury
New Construction, Infrastructure - 7,000 SF
Design
$1,500,000 CJ est. value
Westbury, NY 11590

Purchase Of Split Rock Booster Station Rebid
Addition
Post-Bid
Syosset, NY 11773

Bellerose Village Road Repairs 2022
Infrastructure
Post-Bid
$300,000 CJ est. value
Bellerose Village, NY 11001

Pre-Fabricated Booster Pumping Station Purchase
Addition
Results
Syosset, NY 11773

Harwood Drive Ejector Station and Southridge Drive Pump Station
Renovation
Results
Glen Cove, NY

Wellhead Treatment for Emerging Contaminants and Nitrate Removal at Shelter Rock Road Plant
Renovation
Construction
$8,502,750 CJ est. value
Manhasset, NY 11030

Glen Street Mixed-Use Development
Demolition, New Construction, Infrastructure
Pending Verification
$11,300,000 CJ est. value
Glen Cove, NY 11542

Glen Cove Multi-Residential Development
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Glen Cove, NY 11542

NY 107 Over I495 Bridge Replacement
Demolition, New Construction, Infrastructure
Conception
$22,000,000 CJ est. value
Massapequa, NY 11758

Heritage Village
Demolition, New Construction, Infrastructure - 59,150 SF
Design
$200,000,000 CJ est. value
Hicksville, NY 11801

Tennis Courts and Soccer Field at Westbury Middle School - Contract C Sitework
Renovation, Infrastructure
Post-Bid
$225,000 est. value
Westbury, NY 11590

Site Improvements and Building Repairs at Inland and Southland Building
Infrastructure
Results
$300,000 est. value
Great Neck, NY 11020

Last Updated 06/28/2023 05:04 PM
Project Title

Replacement of Damaged Zoeller Pump Basin

Physical Address View project details and contacts
City, State (County) West Hempstead, NY 11552   (Nassau County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Under this contract, the Contractor shall uninstall and remove all pump and rail components inside existing damaged pump basin to be reused and installed in new pump basin. Remove and dispose of damaged pump basin. Install new Zoeller Engineered Products 33-XXJP 48X210 Pump Basin and re-install all necessary components and rails inside the pump basin. Area surrounding pump basin needs to be restored in kind - topsoil and grass seed. Once completed, contractor shall be responsible to restart the system and ensure it is properly operational per Zoeller requirements. Service-Disabled Veteran-Owned Set Aside: No Minority Owned Sub-Contracting Goal: 0% Women Owned Sub-Contracting Goal: 0% Service-Disabled Veteran-Owned Business Contracting Goal: 0% Disadvantaged Owned Sub-Contracting Goal: 0%

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents