Similar Projects
Lake Carlos Dam Rock Arch Rapids
Results
$250,000 est. value
Carlos, MN

Central City Parallel Tunnel
Post-Bid
MN

Camden State Park Brawner Dam Rehabilitation
Renovation
Results
$435,467 est. value
Russell, MN

Shakopee Lake Dam Repair
Renovation
Results
Benson, MN

Soudan Underground Mine Shaft Rehab
Renovation, Alteration
Post-Bid
MN 55782

Farney Creek Dam Repair and Pipe Replacement
Results
MN

Last Updated 08/31/2021 11:18 AM
Project Title

Repair Tunnel Waterproofing

Physical Address View project details and contacts
City, State (County) Saint Paul, MN   (Dakota County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $250,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Excavate tunnel to footing. Excavated materials will be stockpiled on-site. 2. Remove existing waterproofing. 3. Rewaterproof the tunnel. 4. Install new drainage pipe system connected to existing. 5. Backfill and replace topsoil and sod.

Details

Dam/Tunnel, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents