Similar Projects
Remove Obstructions, Phase III
Bidding
Middletown, New Cumberland, PA 17070

Remove Obstructions, Phase III
Bidding
Middletown, New Cumberland, PA 17070

Weed and Vegetation Control Services for City Owned Parks, Playgrounds and Properties
Post-Bid
Reading, PA 19600

Lawn Care of Township Parks
Term Contract
Post-Bid
Meadville, PA

Buildings and Grounds Maintenance Services, Mahoning Creek Lake
Results
New Bethlehem, PA 16242

Deer Exclosure Dismantling Forest District 7
Results
Harrisburg, PA

Hopewell Park - Phase 1 Landscaping Project
Bidding
Center Valley, PA 18034

Landscaping/Grass Cutting and Trimming
Term Contract
Post-Bid
Lansdale, PA 19446

Crop Tree Release SGL# 323
Results
Less than $6,664 est. value
Howard, PA 16841

Landscape Maintenance Services
Bidding
Bushkill, PA 18324

2020 Lawn Care
Post-Bid
Danville, PA

23SC-SGL 211 Woodrat Habitat PR Project
Results
Dauphin, PA

Mowing of Competing Vegetation - Hand Cut Only
Term Contract
Bidding
PA

23 SW Understory Mowing/Tree Felling SGL 228
Post-Bid
Cairnbrook, PA 15924

23NW-SGL 146 NWTF Herbicide PR Project
Results
Guys Mills, PA 16327

Reported 03/05/2020 12:00 AM
Project Title

Reconstruction of the Existing Final Closure Cap System and Leachate Collection Systems Upgrade Project

Physical Address View project details and contacts
City, State (County) Bloomsburg, PA 17512   (Columbia County)
Category(s) Single Trades
Sub-Category(s) Landscaping/Irrigation
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of the following general scope of construction services noted below. 1. Mobilize equipment and workforce; 2. Establish work limits; 3. Establish perimeter Erosion & Sediment (E&S) control silt sock/fence control measures; 4. Construct Sediment Basins South and West and inlet/outlet structures and stabilize/ revegetate the basin slopes and surfaces; 5. Reconstruct CS-2 leachate collection riser; 6. Reconstruct CS-1 leachate collection riser; 7. Initiate removal and stockpiling of vegetation and topsoil layers; 8. Provide off-site soil material meeting project specifications for use in the reconstruction of the landfill final cover system; 9. Construct work access road across landfill area for cover soil vehicles haul route; 10. Initiate placement, grading and compaction of supplementary final cover soil material; 11. Construct stormwater diversion channels as final cover soil layer construction progresses; 12. Complete placement, grading, and compaction of supplemental final cover soil material; 13. Haul from onsite stockpile, place and grade topsoil material over the areal extent of the completed supplemental final cover soil layer; 14. Prepare final cover soil layer surface and hydroseed all surfaces with seed and fertilizer mixture for revegetation; 15. Maintain, repair, replace (as necessary) E&S perimeter control measures and monitor basins & outlet works for project duration; 16. CQA Consultant to perform as-built survey of completed supplemental cap;

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents