Similar Projects
Last Updated | 08/25/2022 01:02 AM |
Project Title | Roof Replacement of the Lue-Hing M&R Complex Stickney Water Reclamation Plant |
Physical Address | View project details and contacts |
City, State (County) | Cicero, IL 60804 (Cook County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Sewage Treatment Plant |
Contracting Method | Competitive Bids |
Project Status | Construction start expected October 2022 |
Bids Due | View project details and contacts |
Estimated Value | $8,376,000 [brand] Estimate |
Plans Available from | General Contractor |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project consists Interior Renovations including finishes, MEP's and new roof. Trades included but not limited to: Lead Abatement, Selective Demo., Relocation of Office Contents & Equipment, Unit Masonry, Metal Fabrications, Misc. Rough Carpentry, Interior Arch. Woodwork, Metal Wall Panels, SBS Modified Bituminous Protected Membrane Roofing, Firestop System, Joint Sealants, D/F/H, Aluminum Framed Storefront, Glazing, Drywall, Acoustical Panel Ceilings, Resilient Wall Base, Protective Coatings, Resinous Flooring, Carpet Tile, Misc. Service Equipment, Laboratory Fume Hoods, Vertical Louver Blinds, Metal Laboratory Casework, Lab Tops, Sinks, Service Fixtures & Accessories, Control System, Instruments, HVAC, Plumbing, & Electrical. 1. Removal and replacement of existing built-up roofing system, including roof insulation, in multiple roof areas over existing concrete and metal roof decks. 2. Removal, storage, re-installation and/or replacement of condensing units and associated controls and refrigerant piping serving Environmental Rooms, as well as exhaust fans including roof curbs, as shown on the plans and as indicated in the detailed specifications. Test equipment before storing, then re-install, as required with new roof curbs. 3. Reassembly and re-flashing of multiple existing roof curbs scheduled to remain, to account for the increase in roof insulation thickness. 4. Demolition, remodeling and conversion of Room LC215 into a Temporary Trace Metals Laboratory, including moving, installation, calibration and certification of existing DistrictProvided laboratory instruments and supporting equipment. 5. Demolition, remodeling and conversion of Rooms IW209, IW210, IW211 and IW212 into a new Laboratory identified as Trace Metals Lab Room IW212 and Trace Metals Storage Room IW209, including moving, installation, calibration and certification of existing DistrictProvided laboratory instruments and supporting equipment. 6. Demolition and replacement of existing interior finishes, including carpet tile, wall base, paint and acoustical panel metal grid suspended ceiling systems, including removal, moving and re-installation of existing District-Provided office furnishings and equipment. 7. Demolition of ductwork in the IWD Trace Metals Laboratories, IW107 and LE104, as shown on the plans and as indicated in the detailed specifications. 8. Furnish and installation of new ductwork in the IWD Trace Metals Laboratories and IW107, as shown on the plans and as indicated in the detailed specifications. 9. Demolition of laboratory, process, drain and domestic water piping serving the IWD Trace Metals Laboratories and IWD Office and Storage areas as shown on the plans and as indicated in the detailed specifications. 10. Furnish and installation of new laboratory, process, drain and domestic water piping serving the IWD Trace Metals Laboratories and IWD Office and Storage areas, as shown on the plans and as indicated in the detailed specifications. 11. Removal of Mechanical roof-top equipment, as shown on the plans and as indicated in the detailed specifications. Test and store equipment, as required. 12. Furnish and installation of new exhaust fans and condensing units on the roof, including roof curbs, as shown on the plans and as indicated in the detailed specifications. Stored equipment shall be reinstalled, as required, with new roof curbs. 13. Removal and replacement of the condensing units and associated controls serving Environmental Rooms EU-E, EU-F and EU-G. 14. The testing and balancing of the HVAC and hydronic systems for areas affected by the Mechanical work. 15. Demolish receptacles, light fixtures, conduit, and wire. 16. Furnish and install wall receptacles, fire alarm devices, speaker and light switches for the Trace Metals Laboratory. 17. Remove and reinstall the UPS receptacles from the Trace Metals Laboratory to Room LC215 to accommodate the temporary relocation of the ICP instruments. 18. Furnish and install new UPS panelboard. 19. Relocate existing receptacles and provide new connections for fume hoods under Architectural Section. 20. Furnish and install exit signs as shown on the plans. 21. Disconnect and reconnect electrical connections for the Mechanical equipment scheduled for removal and/or replacement under Mechanical Section. 22. Furnish and install duct detectors for new Mechanical air handling units. 23. Fire Alarm System modifications to account for removed fire alarm devices and the installation of new fire alarm devices as shown on the plans. 24. Extend conduit and install new wire for new and existing Mechanical roof equipment as shown on plans to accommodate a new raised roof height. 25. Connect signals to the BCS per Division 13 and as shown on the plans. 26. Reroute existing power and communication Trailer feeds. 27. Furnish and install new safety disconnect switches and junction boxes. 28. Furnish and install conduit and cable as necessary to provide power as shown on the plans. 29. Furnish and install interior and exterior LED lighting system as shown on the plans. 30. Furnish and install new lighting control system as shown on the plans. 31. Furnish and install new photocells on the roof as shown on the plans. 32. Furnish and install Lightning Protection System for the defined work area as shown on the plans. 33. Furnish and install new heat trace system as shown on the plans. 34. Inspection of and report on fire suppression system within commercial kitchen exhaust hoods in Kitchen MW117 and Food Storage & Prep MW118. 35. Furnish and install expansion of the existing Building Control System (BCS) as shown on the plans and as indicated in the detailed specifications. 36. Perform all other work as specified in the detailed specifications and as shown on the plans, including all incidental work. The site of construction is at the Stickney Water Reclamation Plant, 6001 West Pershing Road, Town of Cicero, County of Cook, State of Illinois. Existing District-Provided laboratory instrument and supporting equipment to be moved by theContractor from the John E. Egan Water Reclamation Plant, 550 South Meacham Road, Village of Schaumburg, County of Cook, State of Illinois to the site of construction at the Stickney Water Reclamation Plant. The estimated cost of the work, under Contract 17-135-3V, is between $6,918,000.00 and $8,376,000.00. |
||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |