Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

GIWW West Galveston Bay Barrier Island Reconstruction with Mining of Placement Area No. 64
Infrastructure
Design
$10,000,000 CJ est. value
Galveston, TX 77550

Water, Sanitary Sewer, and Drainage Facilities to Serve Westland Ranch, Section 2 and Magnolia Bayou Drive
Infrastructure
Design
$600,000 CJ est. value
Texas City, TX 77590

Pier 10 Redevelopment / Utility Construction
Post-Bid
Galveston, TX

Pier 10 Redevelopment Roadways, Drainage, Illumination and Traffic Signals
Infrastructure
Post-Bid
Galveston, TX

Annual Asphalt Maintenance
Results
Less than $94,297 est. value
Galveston, TX

Control System Maintenance And Repairs
Results
Texas City, TX

League City Convenience Store
New Construction, Infrastructure - 12,000 SF
Pending Verification
$250,000 CJ est. value
League City, TX 77573

Delaney Cove Section 14 - Landscape, Irrigation, Hardscape, and Electrical
Infrastructure
Pending Verification
Galveston, TX 77550

Postoffice Square - NISU Hospitality
New Construction, Infrastructure - 26,480 SF
Design
$1,800,000 CJ est. value
Galveston, TX 77550

Underground Utilities to Serve Madrid Lane Phase 2 at Coastal Point
Infrastructure
Post-Bid
League City, TX 77573

Water and Sewer Line Locating Service
Results
Texas City, TX

Riverview Mixed-use Development / League City
New Construction, Infrastructure
Pending Verification
$125,000,000 CJ est. value
League City, TX 77573

Windsong Intermediate - 2020 Bond - Friendswood Independent School District
Addition, Infrastructure, Renovation
Design
$4,600,000 CJ est. value
Friendswood, TX 77546

Last Updated 08/18/2022 09:33 AM
Project Title

Sitework; Dirtwork; Paving; Incidentals and Misc. Construction work to Serve Westwood Section 10

Physical Address View project details and contacts
City, State (County) Texas City, TX 77590   (Galveston County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $4,136,124 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**As of August 18, 2022. The Project has been awarded to Harris Construction in the amount of $4,136,124.65.** Westwood Management District is requesting sealed bids for the construction of Water, Sanitary Sewer, Drainage & Paving to serve Westwood Sec.10.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents