Similar Projects
North Shore Terminal Reservoir Phase 2 Expansion Project
Renovation
Design
Orem, UT

Z--Tyzack Pumping Plant Regulating Tank Coating
Term Contract
Design
Vernal, UT

Tuacahn Tank Recoating
Alteration
Bidding
Ivins, UT 84738

Boulder Farmstead Water Company Water Tank
Post-Bid
Less than $510,000 est. value
Boulder, UT 84716

Four (4) 1,000 Gallon Propane Tanks
Post-Bid
Blanding, UT 84511

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

Automated Brine Maker System With Vertical Storage Tanks
Post-Bid
Orem, UT 84057

World-Wide Water Storage Tank Remediation
Term Contract
Results

Zone 2 and 3 Tanks Project
Post-Bid
Herriman, UT 84096

Design/Build Elevated Water Tank Aneth
Results
$100,000 to $250,000 est. value
Aneth, UT 84510

Hyde Park Water Improvements 2020 2.0 MG Concrete Water Tank
Post-Bid
Hyde Park, UT

Enoch City Tank and Booster Project
Results
Less than $110,000 est. value
Enoch, UT 84721

Construction of the Upper Telluride Penstock Pipeline Replacement Phase 1
New Construction, Infrastructure
Post-Bid
Beaver, UT

Concrete Storage Tanks Water Improvements Project
Results
Less than $3,500,000 est. value
Kanab, UT 84741

Last Updated 10/12/2021 12:09 PM
Project Title

Y--Zion-New Water System at Kolob Canyon Water Tank

Physical Address View project details and contacts
City, State (County) New Harmony, UT 84757   (Washington County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replace portions of existing water system at the Kolob Canyons Visitor Center, Zion National Park in Utah. It includes demolition and removal of an existing underground 12,000-gallon fiberglass storage tank, well pumping equipment and chlorination equipment, and replace with a new 50,000-gallo Cast-in-Place concrete water storage tank and associated equipment well pump and equipment, yard piping and associated appurtenances. Work includes construction o bollards, asphalt patching, construction of new water mains and service lines installation of new tank controls, water treatment piping, electrical conduit and wiring, and chemical feed pump. Site work will include trenching, backfilling, native soil replacement, mulching and seeding (revegetation) of all areas along the path of the new water mainline in order.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents