Similar Projects
Hiawatha National Forest Toilets
Demolition
Design
Gladstone, MI

Asbestos Abatement Benzie County Central Schools Benzie Central High/ Middle School Building
Term Contract, Renovation, Infrastructure
Bidding
$750,000 CJ est. value
Benzonia, MI 49616

Hot Mix Asphalt Base Crushing, Shaping and Resurfacing, Permanent Signing and Pavement Markings on Miller Road
Infrastructure
Bidding
$631,000 CJ est. value
Lewiston, MI 49756

Annual Concrete Supply
Term Contract
Sub-Bidding
Midland, MI 48640

Ready Mix Concrete - South West Region
Term Contract
Sub-Bidding
Lansing, MI 48933

M-99 Full Depth Concrete Repair
Post-Bid
MI

M66 Concrete Repairs
Alteration
Post-Bid
MI

Utility Structure and Concrete Repair
Term Contract
Results
Less than $12,280 est. value
MI

Concrete Patches, Us-12 Between Lotz to Heywood Pavt Repair
Alteration
Results
Taylor, MI

Mechanically Stabilized Earth Wall Repair and Concrete Beam Repair From High Load Hit Including Crack Injection and Carbon Fiber Wrap on I-196
Infrastructure
Construction
$209,810 CJ est. value
Wyoming, MI 49519

Crushed Concrete
Term Contract
Sub-Bidding
Traverse City, MI 49684

Concrete Foundation for Fabric Membrane Structure
Alteration
Post-Bid
Jackson, MI

Papp Park Pavilion Concrete Replacement
Alteration
Results
Taylor, MI 48180

Concrete Repair and Installation District Wide 2023
Infrastructure
Sub-Bidding
$800,000 CJ est. value
Midland, MI 48640

Parks Cement Bid
Alteration
Post-Bid
Holland, MI

Last Updated 02/06/2023 12:32 PM
Project Title

Chip and Fog Seal

Physical Address View project details and contacts
City, State (County) Adrian, MI 49221   (Lenawee County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Results, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $220,595 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The description of the work is as follows: Part A. Chip and Fog Seal A certified check or bidder's bond in an amount equal to five percent (5%) of the total amount of the proposal will be required to accompany the proposal. A performance bond, maintenance guarantee bond, and labor/materials bond for 100% of the amount of the Contract will be required. The right to accept any proposal, to reject any or all proposals and to waive any irregularities in any proposal is reserved by the City of Adrian.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents