Similar Projects
Construct Wildlife Shop Facility
New Construction, Infrastructure
Conception
$1,970,900 est. value
Waukesha, WI

C Rice Lake, Hammond Avenue Const / Misc / Culvert Replacement
Renovation, Infrastructure
Conception
$750,000 to $1,000,000 est. value
Cumberland, WI 54829

Multi-Tenant Commercial Building - Storage Units
New Construction - 46,080 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Caledonia, WI

Hamilton Public Works and Hall
Infrastructure - 18,762 SF
Design
$4,845,000 CJ est. value
West Salem, WI 54669

West Badger Road Salt Barn
New Construction, Infrastructure
Bidding
$2,399,455 CJ est. value
Madison, WI 53713

Arlington - Columbus, STH 22 to Commerce Drive
Infrastructure
Bidding
$10,000,000 CJ est. value
Arlington, WI 53911

Spring Harbor Dredging 2022
Infrastructure
Sub-Bidding
$742,800 CJ est. value
Madison, WI 53715

Fuel Storage Tank Demolition
Demolition, Infrastructure
Sub-Bidding
$53,000 CJ est. value
Wausau, WI 54401

Pre-Engineered Metal Buildings
New Construction
Post-Bid
New Berlin, WI 53151

Highway Maintenance Facility - Bid Set 3
New Construction
Post-Bid
Barron, WI

Mold Abatement and Site Restoration Services
Term Contract
Results
Madison, WI

Campus Site Work
Infrastructure
Results
$350,000 est. value
Union Grove, WI 53182

13 Lot Single Family Sub Division
New Construction
Construction
Mequon, WI 53097

Attainment Company Phase 3
Addition - 15,835 SF
Construction
Verona, WI 53593

Legend Storage
New Construction
Pending Verification
West Bend, WI 53095

Last Updated 08/04/2022 03:09 PM
Project Title

New Maintenance, Storage, and Office Building

Physical Address View project details and contacts
City, State (County) Ashland, WI 54806   (Ashland County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Site Development, Warehouse/Storage
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Conditions of the Contract and General Requirements apply to all work of this section. This Section includes all labor, material, equipment and services necessary to furnish and install all hollow metal doors and frames and related items to complete the work indicated on the drawings and described in the specifications. B. Work Included: 1. Steel doors and frames. C. Work Not Included: 1. The following items are related work included in other sections of these specifications: Glass and Glazing *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com.

Details

2 Stories Above Grade, 6,460 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents