Similar Projects
Security Gate Installation
Alteration
Bidding
Dearborn Heights, MI 48127

Memorial Baseball Lights Fence Replacement
Alteration
Bidding
MI

Fencing for DPSCD Schools
Post-Bid
Detroit, MI

Parks Split Rail Fence Remove and Replace
Post-Bid
Wayne, MI

Perimeter Fencing
Results
Livonia, MI 48154

Replenishment of Erosion Controal Blankets and Fencing
Term Contract
Results
Less than $2,010 est. value
Romulus, MI 48174

As-Needed Gate Repairs at PD
Term Contract
Bidding
Dearborn, MI 48126

Installation of Chain Link Fence (Lincoln Hall of Justice)
Post-Bid
Detroit, MI 48207

Perimeter Security Fence Enhancements @ DTW
Results
Detroit, MI 48242

Fencing Services and Material
Post-Bid
Dearborn Heights, MI 48125

Ballpark Replacement Fencing
Results
Dearborn, MI

Fence Replacement
Post-Bid
Westland, MI

Main Gate Replacement
Results
Dearborn, MI 48126

Pillar Repair
Alteration
Post-Bid
Dearborn, MI 48124

Marv Gans Community Park Dog Park Fencing
Results
Northville, MI 48168

Reported 07/14/2021 12:00 AM
Project Title

As-Needed Row Fence Repair Within Wayne County

Physical Address View project details and contacts
City, State (County) MI   (Wayne County)
Category(s) Single Trades
Sub-Category(s) Fencing
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Maintenance Repairs Of Fence On Mdot’s Trunkline System. The Contractor Shall Bid On a Standardized List Of Pay Items That Are Common To Fence Repairs. Specific Project Locations Will Not Be Known At The Time Of Letting And Repair Locations Will Be Spread Sporadically Across The Jurisdiction Area. Locations Requiring Repair Will Be Logged In Arcgis By Mdot. The Contractor Will Be Required To Use Arcgis Software To Document Repairs. Service Will Either Be Standard, Or Emergency As Referenced Herein. Submitted Standard Work Orders Will Need To Be Completed Within 10 Calendar Days Or As Directed By The Engineer Or His/Her Designee. Once Work Has Commenced At a Given Location The Contractor Must Continue Operations At That Location Until The Work Is Completed. Priority Service Mobilization Will Require The Work To Start Within 12 Hours Of Notification. Once Emergency Work Commences At a Specific Site, All Work Must Be Completed And Location Open To Traffic

Details

Division 32 - Exterior Improvements, Fences and Gates.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents