Similar Projects
Access Control Point Program Design Build II -- RFI(2)
Design

IDIQ Job Order Contract, Fort Stewart and Hunter Army Airfield, GA
Design
Fort Stewart, Savannah, GA

Operation and Maintenance of Government-Owned Facilities and Equipment, Jim Woodruff Lock & Dam and Lake Seminole Project, Florida and Georgia
Bidding

Defense Health Agency - Medical Facility Operations and Maintenance
Bidding
$2,500 to $90,000,000 est. value

Amendment 0003 - Design Build Contract for the General Construction Indefinite Delivery/Indefinite Quantity (IDIQ) Multiple-Award Term Contract—with Design-Build Capabilities—for the State of Georgia
Post-Bid
$1,000,000 to $5,000,000 est. value

Weatherization Contractors
Post-Bid

Army Mechanical MATOC
Results
Less than $2,000,000 est. value

Air Force Contract Augmentation Program (AFCAP) V
Results

Liberty County Head Start Facility
Construction
Riceboro, GA

Indefinite Delivery / Indefinite Quantity (IDIQ) Global Contingency Construction (GCC) Multiple Award Contract (MAC)
Design
Less than $5,000,000,000 est. value

Sources Sought Synopsis for United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Post-Bid
$3,000,000 to $15,000,000,000 est. value

South Atlantic Regional Construction IDIQ
Results
$50,000 to $80,000,000 est. value

SB Fuels Multiple Award Task Order Contract (MATOC)
Design
Less than $349,000,000 est. value
Washington, DC

D/B Southeast MATOC - Phase 2
Post-Bid
$1,000,000 to $170,000,000 est. value

Construct Canopy
Results
$500,000 to $1,000,000 est. value
Fort Stewart, GA 31314

Last Updated 10/20/2020 11:38 AM
Project Title

Base Operations and Maintenance Support Services (BOMSS)

Physical Address View project details and contacts
City, State (County) Fort Stewart, GA   (Liberty County)
Category(s) Government/Public
Sub-Category(s) Misc. Buildings
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

BACKGROUND: A continuing need is anticipated for the BOMSS requirements at Fort Stewart and HAAF, Georgia. The draft Performance Work Statement (PWS), Performance Requirements Summary (PRS), Technical Exhibits with workload data, and draft Request for Proposal (RFP) have been previously posted to presolicitation notice, W9124M-18-R-0001, on Federal Business Opportunities (FBO). The contractor shall provide quality services in support of the BOMSS that supports the Warfighter with flexible, efficient, and cost effective service. This is a non-personal services contract consisting of the following eight (8) Common Levels of Support (CLS): CLS Service Title: 403 Solid Waste Management 404 Grounds Maintenance 408 Pavement Clearance 411 Facility Maintenance - Vertical 420 Facility Maintenance - Horizontal 501 Heating and Cooling Services 503 Wastewater Services 510 Pest Management Services The BOMSS tasks includes but are not limited to: - Self Help Supply Center. - Maintenance and Repair of Facilities and Equipment. - Appliances, Food Service Equipment, Washers and Dryers. - Locksmith. - Packing and Crating. - Masonry. - Plaster and Drywall. - Carpentry. - Painting. - Signs. - Plumbing and Pipefitting. - Electrical. - Heating, Ventilation and Air Conditioning. - Sheet Metal and Welding. - Fencing. - Playgrounds. - Pest Control. - Grounds Maintenance/Surfaced Areas. - Refuse Collection and Disposal. - Water Supply and Distribution Systems. - Wastewater Collection and Treatment Systems. - Central Energy Plants, Steam, High/Low Temperature Hot Water (HLTHW) and Chilled Water (CW) Distribution Systems. - Natural Gas and Liquid Propane Systems. - Project Work. - Remote Camp Operations. - Fire Suppression (Beginning start of Option 3)/Fire Alarms. - Range Maintenance. - Landfill Operations. - Mass Notification System. - Appliance and Furnishings Storage and Issue.

Details

Division 01 - General Requirements, Temporary Controls, Temporary Pest Control, Facility Maintenance.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Common Work Results for Masonry, Masonry Mortaring, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 41 - Material Processing and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents