Similar Projects
Mockingbird Hills Subdivision Improvement - 509 - City of San Marcos
Infrastructure
Conception
$8,420,000 est. value
San Marcos, TX 78666

Quail Ridge WasteWater Lines & Lift Station - City of Kyle
Infrastructure
Conception
$1,500,000 CJ est. value
Kyle, TX 78640

Luxe of Buda
New Construction, Infrastructure - 7,066 SF
Design
$750,000 CJ est. value
Buda, TX 78610

Z Tejas Restaurant / Kyle
New Construction, Infrastructure - 4,500 SF
Design
$500,000 CJ est. value
Kyle, TX 78640

Texas Born C-Store & Gas Station / Kyle
New Construction, Infrastructure - 6,500 SF
Bidding
$1,500,000 CJ est. value
Kyle, TX 78640

RM 967 Sidewalk Improvements Onion Creek Bridge to Main Street
Infrastructure
Bidding
$280,000 CJ est. value
Buda, TX 78610

Sunfield WWTP Expansion to 0.99 MGD - Package 8 - Paving, Sidewalks & Mow Strips
Infrastructure
Sub-Bidding
$18,350,000 CJ est. value
Buda, TX 78610

Sunfield WWTP Expansion to 0.99 MGD - Package 9
Infrastructure
Sub-Bidding
$300,000 CJ est. value
Buda, TX 78610

Construction of Kissing Tree West Centerpoint Road Phase 3A
Infrastructure
Post-Bid
San Marcos, TX 78666

Pollo Campero / Kyle
New Construction, Infrastructure - 2,675 SF
Post-Bid
$2,109,500 CJ est. value
Kyle, TX 78640

World-Wide Water Storage Tank Remediation
Term Contract
Results

San Marcos Area Office Refresh
Results
Less than $58,492 est. value
San Marcos, TX 78666

Sunfield WWTP Expansion to 0.99 MGD - Package 3A
Addition, Demolition, Renovation, Infrastructure
Construction
$25,000,000 CJ est. value
San Marcos, TX 78666

AAA Self Storage Expansion Phase II / Dripping Springs
New Construction, Infrastructure - 70,400 SF
Pending Verification
$3,800,000 CJ est. value
Dripping Springs, TX 78620

Windy Hill Cocktail Bar
New Construction, Infrastructure - 2,131 SF
Pending Verification
$210,000 CJ est. value
Kyle, TX 78640

Last Updated 08/26/2022 01:02 PM
Project Title

Waterstone Water Tank Upsize - City of Kyle

Physical Address View project details and contacts
City, State (County) Kyle, TX 78640   (Hays County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Construction start expected June 2024
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A full scope has not been determined. The project is included in the city's 2022-2026 Capital Improvement Program (CIP). As of August 26, 2022, further details regarding design and construction have not been identified.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents