Similar Projects
Papago Plaza - Retail Space and Parking Garage - SIte
New Construction, Demolition - 208,000 SF
Design
$11,000,000 to $16,000,000 est. value
Scottsdale, AZ 85257

Jasper Parkway South
Infrastructure
Design
$3,500,000 est. value
Prescott Valley, AZ 86314

Cactus Middle School Site Improvements
Bidding
Casa Grande, AZ 85122

Community Resource Building Walkway and Service Access Drive Addition
Infrastructure
Bidding
Prescott, AZ

Design-Build Services
Post-Bid
Fort Defiance, AZ 86504

Site Preparation for AMARG Tension Fabric Structures
Post-Bid
Tucson, AZ 85707

City Center Infrastructure Improvements
Results
$1,750,000 est. value
Litchfield Park, AZ 85340

Hudson Point Comm Site Ground Sys Installation
Results
$25,000 to $100,000 est. value
Phoenix, AZ

Attesa Motorsports Complex Phase 1
New Construction
Construction
Casa Grande, AZ 85122

Rocking K South Infrastructure
New Construction - 14,500 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Tucson, AZ 85747

Green Valley Park ADA Site Improvements
Post-Bid
Payson, AZ

Grading and Drainage Project at Ray High School
Results
$198,750 est. value
Kearny, AZ

5290 East Exeter Subdivision
New Construction
Construction
Phoenix, AZ 85018

Bore Drilling
Infrastructure
Post-Bid
Fort Defiance, AZ

2020 CMAQ Alley Dustproofing Design-Bid-Build
Results
Phoenix, AZ 85003

Reported 12/29/2021 03:18 PM
Project Title

Construction: Mansfield Mine Reclamation

Physical Address View project details and contacts
City, State (County) Patagonia, AZ 85624   (Santa Cruz County)
Category(s) Heavy and Highway
Sub-Category(s) Site Development
Contracting Method
Project Status Abandoned
Bids Due View project details and contacts
Estimated Value $250,000 to $500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Reclamation shall be performed in two phases: Phase I is the site preparation; and Phase II is the seeding. Phase I and Phase II shall both be completed at a site before moving on to the next site. Phase I is the site preparation including landscape recontouring and soil decompaction; slash pile and boulder roadway placement; woody debris removal; and fencing and gate installation, to facilitate the restoration of native vegetation within the Mansfield Canyon mine reclamation sites. The USFS expects this work to occur in the fall (late October to December) of 2021. COR shall approve Phase I activities immediately prior to commencement of Phase II activities. Phase II is seeding, hydro mulching, and installing erosion control materials across reclamation areas.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents