Similar Projects
Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Junipero Serra Boulevard Pavement Renovation and Sewer Replacement
Infrastructure
Bidding
$7,000,000 est. value
Colma, San Francisco, CA 94014

Cold Plane and Place HMA, Replace Guardrail and Curb Ramps
Infrastructure
Bidding
$11,400,000 est. value
Belmont, CA 94002

Smooth Streets Program
Infrastructure
Post-Bid
San Mateo, CA

Citywide Street Rehabilitation Package 2-B
Infrastructure
Post-Bid
$1,150,000 est. value
San Mateo, CA

Citywide Street Reconstruction Phase 2
Infrastructure
Results
$1,600,000 est. value
San Mateo, CA

2020-21 Community Development Block Grant Project
Infrastructure
Results
$1,800,000 est. value
San Mateo, CA

Caltrans Route 101 / San Mateo County
Infrastructure
Bidding
$11,400,000 est. value
Half Moon Bay, CA

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

El Capitan Drive Pavement Repair Project
Infrastructure
Results
Millbrae, CA 94030

Road Oil Application in Conjunction with the Countys 2022 Chip Seal Road Maintenance Project
Infrastructure
Bidding
$1,350,000 est. value
Redwood City, CA

Phase Zero New Temporary Haul Road Project
Infrastructure
Post-Bid
East Palo Alto, CA 94303

General Engineering (A License) Construction, San Francisco, San Mateo, Santa Clara, and Alameda Counties
Infrastructure, Alteration
Results
$5,000,000 est. value

2022 Street Resurfacing Program
Infrastructure
Post-Bid
Burlingame, CA

Track 787 Crossing Improvements Project
Infrastructure
Results
Redwood City, CA

Last Updated 06/13/2022 12:07 AM
Project Title

Citywide Street Reconstruction Phase 3

Physical Address View project details and contacts
City, State (County) San Mateo, CA   (San Mateo County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $4,702,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Citywide Street Reconstruction Phase 3 - work involved including preparation, implementation and maintenance of the traffic and pedestrian control plan; portable changeable message signs; barricades; flaggers; temporary ADA compliant pedestrian ramps; materials used for temporary facilities to maintain public vehicular and pedestrian traffic through the work area and to maintain access to adjacent businesses; placing, removing, storing and maintaining No-Parking signs; temporary signs, construction area signs, project funding signs, and other traffic control devices; flagging; loading, hauling, removing, covering and uncovering construction signs; installing and removing temporary striping; and adjustments of the traffic and pedestrian control plans in the field as determined by the Engineer. Type "A" Curb and Gutter Type "B" Curb and Gutter 4" Thick Sidewalk 6" Thick Sidewalk 6" Thick Driveway (Approach) 6" Thick Driveway Conform

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents