Similar Projects
Last Updated | 07/08/2023 08:04 AM |
Project Title | 2023 - Colorado Boulevard Bridge Approach Slab Repairs |
Physical Address | View project details and contacts |
City, State (County) | Centennial, CO 80112 (Arapahoe County) |
Category(s) | Single Trades |
Sub-Category(s) | Concrete |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected August 2023 |
Bids Due | View project details and contacts |
Estimated Value | $274,045 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Reference Number 0000323429 Colorado Boulevard Bridge Approach Slab Repairs Question Acceptance Deadline 06/28/2023 07:00 PM EDT Questions are submitted online Yes Polyurethane Stabilization (Pavement Lifting) ofthe Colorado BoulevardBridge at Big Dry Creek, north and south approach slabs and asphalt pavement. The existing approach slabs, sleeper slabs, and adjacent pavement / sidewalk have settled approximately 5", the polyurethane stabilization (Pavement Lifting) is proposed to reduce future settlement and raise the pavement to provide a smooth transition from the bridge to the surrounding asphalt pavement. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |