Similar Projects
Iowa County Airport
Infrastructure
Bidding
Hollandale, Mineral Point, WI 53544

Replace Runway 11-29 Lighting, Taxiway Lighting, Wind Cone Cabling, and related Electrical
Infrastructure
Bidding
Burlington, WI

Waterway System
New Construction, Renovation
Post-Bid
Germantown, WI

Repair Apron, Truax Field
Post-Bid
Less than $3,500,000 est. value
Madison, WI 53704

Oconto Falls - Oconto, USH 141 - USH 41
Results
Oconto, Oconto Falls, WI 54153

Taxiway M Realignment (Taxiway A Extension)
Renovation
Results
Milwaukee, WI 53207

Rehabilitation Runway 8/26 Taxiway
Infrastructure
Bidding
Boyceville, WI 54725

Sawyer County Airport Apron and Taxilane Reconstruction
Post-Bid
Hayward, WI 54843

Macco Road Culvert Replacement
Results
$150,000 to $175,000 est. value
Dyckesville, WI 54217

WBOA at Alexander Field-South Wood County Airport
Post-Bid
Wisconsin Rapids, WI 54494

CHT U Box Culvert Extension C-44-55
Results
WI

Airfield Ultra-High Pressure Waterblaster Services
Term Contract
Post-Bid
Madison, WI 53704

Price County Airport Runway 1/19 Rehabilitation and Lighting Replacement
Results
Phillips, WI 54555

Taxilane E Rehabilitation
Post-Bid
Mosinee, WI 54455

Rehabilitate Runway 18/36 Shoulders
Infrastructure
Results
Madison, WI

Last Updated 06/25/2021 02:32 PM
Project Title

Dodge County Airport Runway 02/20 Rehabilitation

Physical Address View project details and contacts
City, State (County) Juneau, WI 53039   (Dodge County)
Category(s) Heavy and Highway
Sub-Category(s) Runways/Taxiways
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Rehabilitation of Runway 02/20 including milling, pulverizing, underdrains, storm sewer, grading, erosion control, bituminous paving, landscaping, airfield lighting, runway 02/20 REILs, and pavement marking. Base Bid: Common Excavation, 8,830 CY; Borrow Excavation, 2,300 CY; Removing Underdrain, 8,850 LF; Aggregate Base Course, 9,400 TON; Select Crushed Material, 17,650 TON; Composite Base Course In-Place, 31,900 SY; HMA Asphalt, 7,860 TON; Pavement Marking, 18,290 SF; Milling Bituminous Pavement, 33,900 SY; Underdrain, 8,800 LF; Storm Sewer, 64 LF; Topsoiling, 40,900 SY; Erosion Matting, 10,500 SY; Hydro Mulching, 29,900 SY Alternate A: Flexible Polyduct, 7,700 LF; Taxiway Lights, 76 EA; Runway/Threshold Light Fixture, 56 EA; Guidance Signs, 16 EA; Extend Existing Light Base 17 EA; REILs, 2 LS; Electrical Vault Modifications, 1 LS;

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents