Similar Projects
2021 Contracted Paving Area 31
Post-Bid
Kingsport, TN

Cheatham Stoplog Concrete Storage Slab
Term Contract, Infrastructure, Alteration
Post-Bid
$1,000,000 to $5,000,000 est. value

2021 Contracted Paving Area 35B
Results
Kingsport, TN

Crack Sealing
Results

Parking Lot Paving
Infrastructure
Post-Bid
$200,000 est. value
Bristol, TN

Road Resurfacing on U.S. 421 (S.R. 34)
Results
TN

Asphalt
Infrastructure
Post-Bid
Kingsport, TN

2021 Paving of Fort Henry Drive
Results
Kingsport, TN 37663

2022 Asphalt Maltene Based Road Preservation
Infrastructure
Post-Bid
$728,000 est. value
Kingsport, TN

Legion Drive Roundabout
Results
Kingsport, TN 37664

2022 Area 10 Paving Preservation
Infrastructure
Post-Bid
$3,400,000 est. value
Kingsport, TN

Rockfall mitigation on I-81 at L.M. 19.47, L.M. 19.69 and L.M. 19.99.
Infrastructure
Results
TN

2022 Contracted Paving Area 28A
Infrastructure
Post-Bid
$200,000 est. value
Kingsport, TN

Rock Springs Road Maintenance
Infrastructure
Results
Kingsport, TN 37664

2021 Contracted Paving Area 35A
Infrastructure
Results
Kingsport, TN 37663

Last Updated 07/08/2022 09:19 AM
Project Title

SR-126 (Memorial Blvd.) From East Cooks Valley Rd. to I- 81 in Kingsport - Tennessee Department of Transportation (TDOT)

Physical Address View project details and contacts
City, State (County) Blountville, TN 37617   (Sullivan County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Schematic Drawings, Construction Start Expected March 2025
Bids Due View project details and contacts
Estimated Value $50,100,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for construction along 4.37 miles of existing highway as part of the Tennessee Department of Transportation (TDOT) urban growth program. As of July 2022, the project is in preliminary design and it the right-of-way acquisition process. Two engineering firms have been selected to assist with design work. Information regarding contractor selection has not been disclosed. Construction is projected to begin in 2025. Preliminary Design- underway ROW Appraisal/Acquisition - Forecasted for FY 2023 Construction - Forecasted for FY 2025 *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents