Similar Projects
CyRide Building Water Main Replacement - City of Ames
Renovation, Infrastructure
Conception
$750,000 CJ est. value
Ames, IA 50011

Easton Boulevard - University Avenue - Four Mile Creek - ST263 C038EG - City of Des Moines
Infrastructure
Conception
$1,561,369 CJ est. value
Des Moines, IA 50309

Central Campus Multipurpose
Renovation, Infrastructure
Design
$921,000 CJ est. value
Des Moines, IA 50309

Northglen Trail Replacement - City of Johnston
Infrastructure
Design
$400,000 CJ est. value
Johnston, IA 50131

Rathbun Wildlife Unit Sedan Bottoms Office Utilities Rebid
Infrastructure
Bidding
$60,000 CJ est. value
Mystic, IA 52574

Des Moines Levee Alterations - Phase C
Infrastructure
Bidding
$15,400,000 CJ est. value
Des Moines, IA 50320

Proposed Wastewater Improvements Sanitary Lift Station and Forcemain to Eldon
Renovation, Infrastructure
Post-Bid
$1,238,000 est. value
Eldon, IA 52554

Proposed Wastewater Improvements Sanitary Lift Station and Forcemain to Eldon
Renovation, Infrastructure
Post-Bid
$1,238,000 est. value
Eldon, IA 52554

WWTF Improvements UV Disinfection
Renovation
Results
Walford, IA

Wastewater Treatment Plant Improvements 2021 - Aerobic Digester No. 1 Replacement
Renovation
Results
Fairfield, IA 52556

SUX Aviation Center Project Rebid
New Construction, Infrastructure - 39,400 SF
Pending Verification
$13,644,584 CJ est. value
Sioux City, IA 51111

City Park - City of Alta
Infrastructure, Renovation
Pending Verification
$475,600 CJ est. value
Alta, IA 51002

Public Works Satellite Salt Storage Building - 170th Street and Waterford Road - BU21-02 - City of Urbandale
New Construction, Infrastructure
Conception
$700,000 CJ est. value
Urbandale, IA 50263

PCC Curb and Gutter
Infrastructure
Design
$500,000 CJ est. value
Le Mars, IA 51031

Weavers Cove Well and Test Wells
Infrastructure
Bidding
$180,000 CJ est. value
Iowa Falls, IA 50126

Last Updated 10/05/2022 09:32 AM
Project Title

Treatment Plant and South West Pump Station Improvements

Physical Address View project details and contacts
City, State (County) Newton, IA 50208   (Jasper County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sewage Treatment Plant, Site Development, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $6,300,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work includes furnishing labor, equipment, and new materials for construction of the project. Major scope items include the following: Water Pollution Control Plant: 1. New 1 million gallon liquid sludge storage tank with tank mixing system and loadout station. 2. New standby power generator and associated electrical power improvements. 3. Rehabilitate three existing floating steel digester covers, including painting, new slide/guide system and other improvements. 4. Replacement of two sludge pumps. 5. New influent channel mixing system. 6. Replacement of plant PLC's. 7. Associated site, demolition, electrical, mechanical, and other associated work items. Southwest Pump Station: 1. Replace both 150-hp pumps with new 200-hp pumps. 2. Replace pump station interior dry well piping. 3. Associated site, demolition, electrical, mechanical, and other associated work items. The method of construction shall be by contract in accordance with the Bidding Requirements and Contract Documents for said improvements approved by the Newton City Council. Each proposal shall be made out on a blank form furnished by the City and shall be submitted in a sealed envelope marked, Newton Wastewater Improvements, Newton, Iowa. Each proposal must be accompanied either by a cashier's check or certified check in the amount of five percent (5%) drawn on an Iowa bank or a bank chartered under the laws of the United States, a Bid Bond or credit union certified share draft in the amount of five percent (5%) of the proposal, drawn on a credit union in Iowa or chartered under the laws of the United States and filed in an envelope separate from the one containing the proposal, made payable to the City of Newton, Iowa, and said check or draft may be cashed or the Bid Bond declared forfeited by the City of Newton, Iowa as liquidated damages in the event the successful bidder fails to enter into a contract within fifteen (15) days of the Notice of Award and post bond satisfactory to the City insuring the faithful fulfillment of the contract and maintenance of said improvements as required by law and the Specifications. Payment to the Contractor for said construction will be made in cash from the following sources: Cash from any fund of City of Newton, Iowa, which may be legally used for such purposes; proceeds derived from the sale and issuance of Utility Revenue Bonds, or Federal or State grants or loans. The Contractor will be paid each month Ninety-five Percent (95%) of the Engineer's Estimate of the value of work completed at the end of the preceding month. Final payment will be made no sooner than thirty (30) days after completion of the work and acceptance by the Owner. The work under the proposed contract shall commence within thirty (30) days of the written "Notice to Proceed." The work shall be substantially completed by June 3, 2024 and with final completion by July 3, 2024, subject to any changes granted by the Owner. By virtue of statutory authority, a preference will be given to products and provisions grown and coal produced within the State of Iowa, and to Iowa domestic labor. The successful bidder will be required to furnish a bond in an amount equal to 100% of the contract price, and said bond to be issued by a responsible surety approved by the Owner and shall guarantee the faithful performance of the contract and the terms and conditions therein contained, and the warranty of the materials and workmanship for not less than two (2) years from the time of acceptance of said improvements by the City Council. The Owner reserves the right to defer acceptance of any proposal for a period not to exceed forty-five (45) days from the date of receipt of proposals. The Owner reserves the right to reject any or all proposals and to waive informalities.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Decking, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, Facility Fuel Piping, Facility Fuel-Storage Tanks, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Systems, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents