Similar Projects
Boutique Hotel
New Construction - 52,671 SF
Conception
Capitola, CA 95010

Highway 1 Pedestrian Bridge - City of Watsonville
Infrastructure
Conception
$11,700,000 CJ est. value
Watsonville, CA 95076

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Construct Retaining Wall, Widen Shoulders, Restore Pavement, Improve Drainage
Infrastructure
Design
$1,367,000 est. value
Boulder Creek, CA 95006

Construct Pedestrian Overcrossing and Auxiliary Lane
Infrastructure
Bidding
$26,000,000 est. value
Capitola, CA 95010

Paper Mill Road Address 3559 Storm Damage Repair Project
Infrastructure
Bidding
$225,545 est. value
Soquel, CA 95073

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Overlay Existing Roadway with RHMA-G (BWC)
Infrastructure
Post-Bid
$3,790,000 est. value
CA

Pinehurst Drive and Greenbrier Drive Pedestrian Improvements Project
Infrastructure
Results
Rio del Mar, Santa Cruz, CA 95003

SCCSD 2021 Slurry Seal Project
Infrastructure
Results
Less than $60,000 est. value
Capitola, Santa Cruz, CA

MBSST (Rail Trail) Segments 8 and 9 (Pacific Avenue to 17th Avenue) Project - City of Santa Cruz
Infrastructure
Design
$23,000,000 CJ est. value
Santa Cruz, CA 95060

Ridge Drive Storm Damage Repair Project
Infrastructure
Bidding
$263,850 est. value
Los Gatos, CA 95033

Pavement Replacement
Infrastructure
Post-Bid
$280,000 est. value

2021 Road Repair Project
Infrastructure
Results
$135,380 est. value
Capitola, CA 95010

CSA 13 - Hutchinson Road Chip Seal Project
Infrastructure
Bidding
$197,249 est. value
Los Gatos, CA 95033

Last Updated 07/26/2022 04:32 PM
Project Title

Hill Street Boutique Hotel

Physical Address View project details and contacts
City, State (County) Capitola, CA 95010   (Santa Cruz County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Hotel/Motel, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation
Project Status Obtained from a credible source, Awaiting verification, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $6,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a hotel. As of July 26, 2022, this project is pending Design Permit, Conditional Use Permit, and Tree Removal Permit approval. Information regarding the selection of a general contractor has not been released. While a firm construction timeline has not yet been established, construction is expected to begin in the fourth quarter 2022. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Parking Space/Stalls, 30 Parking Spaces. 3 Stories Above Grade, 18,261 SF Rooms, 42 Unit(s).
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Structural Concrete, Precast Concrete Slabs.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Hospitality Furniture.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Medium-Voltage Electrical Distribution, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Call Management.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents