Similar Projects
US Cellular Center Mechanical/HVAC Renovation
Post-Bid
Asheville, NC

HVAC Replacements
Post-Bid
Salisbury, NC

56--Upgrade OA & Exhaust Fans Phase II(VA-19-00005148)
Demolition
Results
$500,000 to $1,000,000 est. value
Durham, NC 27705

Frank Porter Graham Elementary School - Intermediate & Media Buildings Hvac Replacement
Results
Chapel Hill, NC

McEniry HVAC and IT Infrastructure Upgrades
Construction
$10,000,000 est. value
Charlotte, NC 28223

JC Morgan HVAC Replacement
Post-Bid
High Point, NC 27260

Brinkley Building Cosmetology HVAC Upgrades
Results
Thomasville, NC

20 Ton Air-Cooled Chiller
Post-Bid
Greensboro, NC 27412

Cordelia Camp Backfill - Admissions to HFR 1st Floor Upfit - HVAC System
Results
Cullowhee, NC 28723

PC Air Units
Post-Bid
Charlotte, NC 28208

Chancellor's Residence HVAC Renovation
Results
Chapel Hill, NC 27514

Chiller Service and Inspection
Term Contract
Post-Bid
Pembroke, NC

Install 10 HVAC Systems in RHA Occupied Public Housing Community
Results
Rockingham, NC 28379

DSS Building - Chiller Replacement Phase 2
Post-Bid
Fayetteville, NC 28301

Hope Mills and South View Middle School Gymnasium HVAC Renovation Project
Results
Hope Mills, NC 28348

Last Updated 05/27/2020 01:59 PM
Project Title

HVAC Replacement - Greenville Convention Center

Physical Address View project details and contacts
City, State (County) Greenville, NC   (Pitt County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. The Contractor shall provide all labor, equipment, crane, materials and insurance necessary to remove and replace the rooftop HVAC units (7 units), six 27.5 ton packaged and one 6 ton package and all necessary work to complete installation per the attached equipment specifications and drawings document, labeled as Exhibit "B". 2. New rooftop units shall be manufactured by Trane. No other manufacture will be accepted. 3. Include extended warranty of 10 years for compressor and heat exchanger parts as well as a 5 year parts, refrigerant and labor warranty. 4. Start up and commissioning shall be performed by Trane authorized representative. 5. The new 27.5 ton units will be placed on the existing curb with a new gasket provided by contractor. Visual inspection by the city and contractor of duct shall be performed prior to setting units in place. If any work is deemed necessary by the City than a change order will be created. 6. The new 6 ton unit will require an adapter to the existing curb with a new gasket provided by contractor. Visual inspection by the city and contractor of duct shall be performed prior to setting units in place. If any work is deemed necessary by the City than a change order will be created. 7. Install all new electrical service disconnects with watertight conduit from service disconnect to units. 8. All electrical and duct connections shall be included. 9. Installation of all programmable zone sensors.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents