Similar Projects
Leeds Parkway Drive Pump Station SSO Abatement
New Construction
Bidding
$6,900,000 to $7,400,000 est. value
Leeds, AL

Fort Morgan Road Sewer Improvements - Marina Lift Station and Peninsula Lift Station
Renovation
Bidding
Gulf Shores, AL 36547

Morgan Road Bypass Lift Station Reconstruction
Post-Bid
$200,000 to $205,000 est. value
Camden, AL 36726

Glass-Fused-to-Steel (GFS) Bolted Ground Water Storage Tank and Booster Station Improvements
Post-Bid
Blountsville, AL 35031

Duck River Reservoir Phase II - Raw Water Pump Station
Results
Less than $10,590,800 est. value
Cullman, AL 35055

Eslava Lift Station Bar Screen Replacement
Results
Mobile, AL

Construction of Sewage Pumping Station Rehabilitation
New Construction
Bidding
$260,000 est. value
New Brockton, AL

New Industrial Area Booster Pump Station
Post-Bid
Decatur, AL 35609

Improvements to the Lakewood Pump Station
Results
Less than $679,675 est. value
Dothan, AL 36303

Sewer Pump Station Improvements
Renovation
Bidding
Less than $375,000 est. value
Carbon Hill, AL 35549

New Pumping Station (Contract C)
Post-Bid
Irvington, AL 36544

Dog River Lift Station Relocation
Results
Less than $800,119 est. value
Mobile, AL 36605

Rehabilitation of Pumping Station No. 2
Post-Bid
Less than $110,000 est. value
Samson, AL

Eslava Creek 48in Force Main Replacement Phase III 1-A Broad Street to Baker Street
Results
Less than $4,300,000 est. value
Mobile, AL

2020 Sanitary Sewer Lift Station Improvements
Post-Bid
Less than $300,000 est. value
Hayneville, AL 36040

Reported 05/05/2021 12:00 AM
Project Title

Raw Water Pump Station Improvements

Physical Address View project details and contacts
City, State (County) Tuscaloosa, AL   (Tuscaloosa County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project include replacement of existing inlet valves, valve stems and stem guides, demolition and replacement of structural tie-rods, demolition of existing concrete splash guards, repair of rust pitting on submerged steel surfaces, preparation and application of high performance coatings and corrosion protection systems for submerged, non-submerged surfaces and structural steel surfaces.

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents