Similar Projects
Widening SH-3 and conducting levee repair between MP 91.86 and MP 89.26
Infrastructure
Bidding
ID

Widening SH-21 Between MP 0.787 and 3.023
Infrastructure
Bidding
$2,500,000 to $5,000,000 est. value
ID

Construction Services for Cleanup of Upper Basin of the Bunker Hill Mining and Metallurgical Complex Superfund Site
Infrastructure, Alteration
Post-Bid
ID

Spruce Street Road Maintenance Project
Infrastructure
Results
Less than $200,000 est. value
Sandpoint, ID 83809

SH-64, NezPerce to Drake Road
Infrastructure
Results
$100,000 to $500,000 est. value

Capital Maintenance Phase Two
Infrastructure
Bidding
$2,500,000 to $5,000,000 est. value
ID

DIJ Construct Taxilane
Infrastructure, Alteration
Results
$1,255,580 est. value
Driggs, ID 83422

Seal Coat
Infrastructure
Bidding
$2,500,000 to $5,000,000 est. value

Runway 2/20 Pavement Maintenance at Sandpoint Airport
Infrastructure
Results
Sandpoint, ID 83864

Pavement Preservation on US-93
Infrastructure
Bidding
$500,000 to $1,000,000 est. value
Twin Falls, ID 83303

Widening US-95 from MP 471.33 to 471.75 to add both southbound and northbound acceleration lanes
Infrastructure
Results
ID

Road Improvements
Infrastructure
Bidding
$500,000 to $1,000,000 est. value
ID

Ramsey Z-Wall Extension
Addition, Alteration
Results
Coeur d'Alene, ID 83815

Idaho Federal Aid Project - Pavement Preservation on US - 93
Alteration
Bidding
ID

Engineering Services for Design Of Worley Minor Streets Repair Phase 2
Infrastructure
Results
Worley, ID 83876

Last Updated 09/22/2021 02:32 AM
Project Title

Crabs, Upgrading Guardrail, Installing Underdrains, and Increasing Shoulder

Physical Address View project details and contacts
City, State (County) ID   (Bingham County)
Category(s) Heavy and Highway
Sub-Category(s) Highway Signs/Guardrails/Barriers, Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,000,000 to $10,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

For the work of CRABS, upgrading guardrail, installing underdrains, and increasing shoulder width on SH-39 from MP 30.00 to MP 35.50

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Roadway Construction, Vehicle Barriers, Impact Attenuating Devices.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents