Similar Projects
Costco / Guilderland
New Construction, Infrastructure - 158,202 SF
Conception
$20,000,000 CJ est. value
Albany, NY 12203

Costco / Guilderland
New Construction, Infrastructure - 158,202 SF
Conception
$20,000,000 CJ est. value
Albany, NY 12203

Repair Parking Lot
Infrastructure
Design
$10,000,000 CJ est. value
Albany, NY 12208

Repair Parking Lot
Infrastructure
Design
$10,000,000 CJ est. value
Albany, NY 12208

Cohoes Avenue Pavement Preservation
Infrastructure
Bidding
$1,000,000 CJ est. value
Green Island, NY 12183

Cohoes Avenue Pavement Preservation
Infrastructure
Bidding
$1,000,000 CJ est. value
Green Island, NY 12183

Clinton Phase II
New Construction, Renovation, Infrastructure
Sub-Bidding
$7,000,000 CJ est. value
Albany, NY 12210

Clinton Phase II
New Construction, Renovation, Infrastructure
Sub-Bidding
$7,000,000 CJ est. value
Albany, NY 12210

Reconstruction of Alumni Drive and other Campus Enhancements at University of Albany
Post-Bid
Albany, NY 12203

Woodlawn Paving, Sealcoating and Striping
Post-Bid
Schenectady, NY 12304

Z1DA--528A8-18-806 D-Stream Upgrade Site Prep (VA-20-00005571)
Results
$500,000 to $1,000,000 est. value
Albany, NY 12203

Uptown Campus Pedestrian and Hardscape Safety Improvements
Results
Albany, NY 12222

South Pearl Street Group Living Shelter Addition
Addition, Demolition, Infrastructure - 30,972 SF
Pending Verification
$5,000,000 CJ est. value
Albany, NY 12202

Ceroni Commercial Apartments
New Construction, Infrastructure
Pending Verification
$4,000,000 CJ est. value
Albany, NY 12205

Pedestrian Friendly Environment Including Safe Routes to School - City of Cohoes
Infrastructure
Conception
$4,565,350 est. value
Cohoes, NY

Last Updated 09/01/2022 04:06 PM
Project Title

Day Care Center

Physical Address View project details and contacts
City, State (County) Albany, NY 12203   (Albany County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Pre-School/Daycare, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $710,500 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

3,500 sf building addition of the existing structure with parking lot improvements. As of September 1, 2022, this project is has received approvals from the Town of Bethlehem Planning Board. A building permit has yet to be issued. Information about the selection of a general contractor and a firm construction timeline has not been released.

Details

3,500 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents