Similar Projects
Pronto Freight Ways - Addition
Addition - 16,500 SF
Conception
Taylor, MI 48180

Mastronardi Produce - Addition
Addition - 85,000 SF
Conception
$8,600,000 est. value
Livonia, MI 48150

Pinnacle Race Course
New Construction - 1,200,000 SF
Design
$10,000,000 CJ est. value
Huron Township, MI

Conner Street Warehouse Development - Speculative
New Construction, Demolition - 1,598,000 SF
Design
$47,900,000 est. value
Detroit, MI 48213

Public Storage
New Construction
Post-Bid
Trenton, MI 48183

Outside Storage Building - DPS
Results
MI

Construction Contract for the Customs and Border Protection Seized Cargo Facility
New Construction, Renovation
Results
$1,000,000 to $5,000,000 est. value
Detroit, MI 48216

UTSI Finance – Design Build PEMB Super Center
New Construction - 54,000 SF
Construction
$13,000,000 est. value
Dearborn, MI 48126

Livonia Budget Self-Storage Facility
Renovation
Construction
Livonia, MI 48152

Insite Logistics Facility - Project Viper
New Construction - 138,435 SF
Pending Verification
$10,000,000 CJ est. value
Romulus, MI 48174

The Parade Company - New Location
Renovation, Addition, Demolition - 130,300 SF
Conception
$30,500,000 est. value
Detroit, MI 48214

Detroit River IWR Storage Building
New Construction
Results
$100,000 to $250,000 est. value
Trenton, MI

Amazon Distribution Center
New Construction - 832,173 SF
Construction
$400,000,000 est. value
Detroit, MI

Gleaners Community Food Bank - New Location
Renovation - 180,896 SF
Conception
$15,000,000 est. value
Taylor, MI 48180

Storage Room Addition
Results
Grosse Ile, MI 48138

Last Updated 07/10/2020 02:47 PM
Project Title

Department of Public Works Water and Sewer Garage

Physical Address View project details and contacts
City, State (County) Grosse Pointe Woods, MI 48236   (Wayne County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work involved for this project is as follows: Construction of a 3,200 sq. foot wood framed garage with metal siding and roof along with all applicable site work.

Details

1 Warehouse/Storage, 3,200 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents